Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP20-0050

Parcel: 13213089A

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP20-0050

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
06/03/2021 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 -
11/04/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by PAHUMAD1 - Continued. No track out present. Protections in place. Large stock piles of material on site.
10/13/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continue. Please schedule stormwater follow up inspection biweekly
10/06/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. No issues or concerns at this time
09/30/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No issues at this time
09/30/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No issues at this time
09/24/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. Barricades from private road have been removed.
09/22/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. No issues.
09/17/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - continued. Barricades have been installed preparation of manhole connection. Private drive.
09/14/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - . Continued. No issues. Controls are in place