Permit: DP20-0050

Parcel: Unknown

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
04/01/2021 ENGR Grading Final MHERNANDEZ Approved Entered by VLEON1 -
02/10/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 1054 E TUCSON MARKETPLACE BL- REBAR AND POURING THE FRONT OF THE TRASH BINS
11/06/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Trash enclosure footings
04/06/2021 ENGR Grading Final DROBERT5 Approved Entered by DROBERT5 -
04/06/2021 ENGR Grading Final DROBERT5 Approved Entered by DROBERT5 -
04/06/2021 ENGR Grading Final DROBERT5 Approved Entered by DROBERT5 -
02/10/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 1054 E TUCSON MARKETPLACE BL - DRIVEWAYS
10/28/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - Continued. Storm drains and domestic sewer piping has been backfilled. No grading activity at this time.
10/13/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continue. Provide a watertight connection as prescribed in standard detail requirements for building rainwater piping at site stormwater Drain piping 5 feet outside of building foundation.
10/09/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Completion of stormwater piping and manholes.
10/08/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Backfilling piping in Roadway
10/06/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Completing last section of stormwater piping in private roadway.
10/02/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Manholes.
10/01/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Catch basins.
09/30/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Stormwater piping connections to manhole and catch basins
09/29/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Catch basins and manhole bases installed
09/28/2020 ENGR Grading Final DROBERTS Continued Entered by JSCHNEI2 - CONTINUED AT THIS TIME, SITE LOCKED AND ALL PERSONNEL HAVE LEFT FOR THE DAY AT 3:45PM. CREWS ARE WORKING ON SITE WORK AND PREPARING FOR THE SUB-GRADE FOR THE FLOOR SLAB POUR IN THE FUTURE. THEY HAVE CORRUGATED PLASTIC LAYING ON SITE BUT NOTHING WAS CHECKED ON THIS DATE.
09/25/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Contractors installing pre-manufactured catch basins.
09/24/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Backfill of storm drains.
09/23/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Continuation below grade stormwater piping and shading.
09/22/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Storm water piping
09/21/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Storm drain from manhole onto site.
09/17/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - continued. Barricades have been installed preparation of manhole connection. Private drive.
09/14/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Courtesy inspection prior to storm drain piping and connections. Plans indicate storm water piping connection point is within a private street indicating no right of way inspections are necessary. Richard will schedule inspections and document all connections and piping for inspection.
09/04/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - . Continued. Contractor has started over excavation and site sewer. Magnum contracting and Barker Morisey