Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
3250 S PARK AV
Apply Date:
02/20/2020
Applicant:
Blake Junak
Description:
SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.

Permit Reviews

Permit Number - DP20-0039
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Start Date Submittal Complete Date Status  
02/20/2020 DEV PKG - OK TO SUBMIT 02/26/2020 COMPLETED Review Details
02/26/2020 DEV PKG 04/06/2020 COMPLETED Review Details
04/30/2020 DEV PKG - RESUBMITTAL 06/01/2020 COMPLETED Review Details
06/15/2021 DEV PKG - RESUBMITTAL 07/06/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP20-0039
Permite Description: SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/13/2022 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 09/13/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN INSTALLING 18 R.C.P. FOR CATCH BASIN NORTH OF PROJECT.}
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
06/14/2023 PDSD Site/Engineering Division - Landscaping N/A Complete (Recurring) no concerns with the landscaping at this time. Contractor asked for a TCFO for stocking and he’s good to stock hello hi this is Lola with North American Shania benefits. How are you? I’m fine I’m busy right now I can’t talk to you. Thank you OK.
07/19/2023 ENGR Engineering Final N/A Partial Pass contractor needs to remove the waddles and all the material which is on site before getting the CO
01/31/2023 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns at this time
03/15/2023 ENGR Grading Final N/A Complete (Recurring) Call Dan from stormwater follow up no concerns at this time everything’s good
11/30/2022 SITE - Stormwater Final Inspection N/A Complete (Recurring) Not ready for a final inspection on STORMWATER

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0039
Permit Description: SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/28/2022 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/28/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - APPROVED}
11/28/2023 PDSD Site/Engineering Division - Landscaping Passed
11/28/2023 ENGR Engineering Final Passed
11/28/2023 SITE - Stormwater Follow-up Passed
11/28/2023 ENGR Grading Final Passed
11/28/2023 SITE - Stormwater Final Inspection Passed
11/28/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR OF RECORD.PDF DOCUMENTS VIEW
1-14 OF 14.PDF DEVELOPMENT PACKAGE VIEW
DISCLOSURE_STATEMENT, AIRPORT, RECORDED.PDF DOCUMENTS VIEW
AVIGATION_EASEMENT, RECORDED.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 05.21.21.PDF DOCUMENTS VIEW
SUMMARY OF CHANGES LETTER - WATERWALK.PDF DOCUMENTS VIEW
LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
TYPE III_CAPACITY_RESPONSE_SOUTH_SIDE.PDF DOCUMENTS VIEW
DRC_APPROVAL_LETTER.PDF DOCUMENTS VIEW
CCRS.PDF DOCUMENTS VIEW
TYPE_III_REQUEST_SOUTH_SIDE.PDF DOCUMENTS VIEW
CIVIL_RESPONSE, 04.30.2020.PDF DOCUMENTS VIEW
FAA_EMAIL_NO_FORM_7460_REQUIRED.PDF DOCUMENTS VIEW
PIMACO ADDRESSING REVIEW, 03.30.2020.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
APPLICATION_SIGNED.JPG DOCUMENTS VIEW
TEP APPROVAL LETTER, 03.03.2020.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 03.03.2020.PDF DOCUMENTS VIEW
TEP REDLINE PLAN SET, 03.03.2020.PDF DOCUMENTS VIEW