Permit: DP20-0039
Permit Details
Apply Date:
02/20/2020
Applicant:
Blake Junak
Description:
SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Permit Reviews
Permit Number - DP20-0039
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/20/2020 | DEV PKG - OK TO SUBMIT | 02/26/2020 | COMPLETED |
02/26/2020 | DEV PKG | 04/06/2020 | COMPLETED |
04/30/2020 | DEV PKG - RESUBMITTAL | 06/01/2020 | COMPLETED |
06/15/2021 | DEV PKG - RESUBMITTAL | 07/06/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP20-0039
Permite Description: SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 09/13/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN INSTALLING 18 R.C.P. FOR CATCH BASIN NORTH OF PROJECT.} |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
06/14/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Complete (Recurring) | no concerns with the landscaping at this time. Contractor asked for a TCFO for stocking and he’s good to stock hello hi this is Lola with North American Shania benefits. How are you? I’m fine I’m busy right now I can’t talk to you. Thank you OK. |
07/19/2023 | ENGR Engineering Final | N/A | Partial Pass | contractor needs to remove the waddles and all the material which is on site before getting the CO |
01/31/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time |
03/15/2023 | ENGR Grading Final | N/A | Complete (Recurring) | Call Dan from stormwater follow up no concerns at this time everything’s good |
11/30/2022 | SITE - Stormwater Final Inspection | N/A | Complete (Recurring) | Not ready for a final inspection on STORMWATER |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0039
Permit Description: SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/28/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - APPROVED} | |
11/28/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
11/28/2023 | ENGR Engineering Final | Passed | ||
11/28/2023 | SITE - Stormwater Follow-up | Passed | ||
11/28/2023 | ENGR Grading Final | Passed | ||
11/28/2023 | SITE - Stormwater Final Inspection | Passed | ||
11/28/2023 | COT - ENGR - Signage Final | Passed |