Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel132131140
132130750
13213075A
JurisdictionTucson
City of Tucson ZoningPAD-15
Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Rezoning Cases

Date - 07/03/2024 9:45 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-06-32 The Bridges PAD - Kino Pkwy PAD Effectuated 11/28/2006

Permits

Address: 3250 S PARK AV
Date - 07/03/2024 9:45 p.m.
Total Number Of Permits - (9)
Permit Status Apply Date Expired Date Unit Type Description
T20CM06127 Expired 09/09/2020 04/11/2021 Commercial Building PHASE 2 PRIVATE SEWER
DP19-0178 Issued 07/29/2019 08/22/2022 Development Package SITE/GRADING/SWPPP - The Bridges, Sub-Area B-4. Initial infrastructure.
DP20-0147 Complete 07/20/2020 03/13/2023 Development Package SITE/GRADING/SWPPP - Whataburger restaurant.
T22CM04322 Issued 06/10/2022 01/23/2023 Commercial Building Installation of exterior synthetic stucco
T20CM01184 Expired 02/21/2020 09/09/2020 Commercial Building W - PRIVATE SEWER
DP20-0039 Complete 02/20/2020 11/27/2026 Development Package SITE/GRADING/SWPPP - Waterwalk at the Bridges, multi-story hotel.
T20RW03293 FINAL 06/10/2020 04/11/2021 ROW NEW GAS MAIN TO SERVE THE NEW DEVELOPMENT ACROSS FROM TUCSON MARKET PLACE BLVD. AS PART OF THE PROJECT, SWG IS REFORCING THE GAS LINE ON E 39TH ST. THERE ARE TWO EXISTING GAS SUBS ON THE WEST SIDE OF PARK AVE THAT WILL BE USED TO PROVIDE GAS SERVICE TO THE NEW DEVELOPMENT AS WELL. A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. Park Av was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. ADDRESSCHANGED FROM: "PARK AV & TUCSON MARKETPLACE BLVD" TO "3250 S PARK AV"
T20RW03441 FINAL 06/17/2020 12/15/2020 ROW N.686580 - JOB WILL REQUIRE 281 FT OF BORING, ACCESS TO MH #15377 TO SPLICE AND PLACE FIBER. PLACE (2) DIG PITS 4'X4' AND PLACEMENT OF NEW 3048 HH
T22RW00513 FINAL 02/14/2022 04/30/2022 ROW THE BRIDGES SUBM-AREA B-IV; DP19-0178 PLACEMENT OF TRAFFIC CONTROL IN CITY RIGHT-OF-WAY FOR WORK ON PRIVATE PROPERTY. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813

Plans

Address: 3250 S PARK AV
Date - 07/03/2024 9:45 p.m.
Total Number Of Plans - (4)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-20-0147 Active 07/20/2020 03/13/2023 -- Commercial Water Harvesting Ordinance SITE/GRADING/SWPPP - Whataburger restaurant.
S21-027 Complete 05/17/2021 N/A -- Land Split/Lot Split Bridges B-4, Land Split
S20-077 FINAL 12/22/2020 N/A LOT SPLIT -- LSPT LAND SPLIT / Reconfiguration - The Bridges, Sub-Area B-4, Lots 1A, 1B, and 10.
T20PRE0037 CLOSED 02/24/2020 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site: Whataburger, new restaurant.