Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0039
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/17/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN POURED FOR CATCH BASIN ONE ONTHE SOUTH WEST AND THE OTHER ONE NORTH WEST OF BUILDING |
10/13/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN FORMING FOR THE FLOOR FOR CATCH .TWO OF THEM ONE ON THE SOUTH WEST SIDE OF BUILDING AND THE OTHER ONE AT NORTH WEST OF BUILDING. |
09/14/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN SET THE REBAR FOR TRASH BIN FOOTER.TWO OF THEM |
08/30/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /GRADING FOR SIDEWALK . |
06/16/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN / EXCAVATED FOR STORM DRAINAGE PIPE ON THE NORTH END OF BUILDING .CONTRACTOR SENT PHOTO TO ME TOO. |
06/08/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN |
02/28/2022 | ENGR Grading Final | MERNANDEZ | Continued | Entered by VVERA1 - CN./ |
03/02/2023 | ENGR Grading Final | Complete (Recurring) | contractor need to put chairs underneath the steel at the trash enclosures floor both of them one on the doorside and the one on the southside. Steel on the north side trash enclosure needs to be extended out but another 5 foot. I need to reinspect it on Monday | |
03/06/2023 | ENGR Grading Final | Complete (Recurring) | Contractor setting the foreign for the aprons at the trash enclosures the one on the Northwest and the one on the Southwest of the building | |
03/15/2023 | ENGR Grading Final | Complete (Recurring) | Call Dan from stormwater follow up no concerns at this time everything’s good | |
11/28/2023 | ENGR Grading Final | Passed | ||
11/28/2023 | ENGR Grading Final | Passed | ||
11/28/2023 | ENGR Grading Final | Passed | ||
12/05/2022 | ENGR Grading Final | Complete (Recurring) | The trash bin on the south west side needs to be reformed and report its non-conforming with the City Of Tucson | |
12/06/2022 | ENGR Grading Final | Complete (Recurring) | Reforming the footers for the trash enclosure on the south west corner of the building it’s good to pour | |
12/14/2022 | ENGR Grading Final | Complete (Recurring) | Is she number seven bars for the footage for the canopy foot foundations good to pour for tomorrow morning | |
12/22/2022 | ENGR Grading Final | Complete (Recurring) | Contractor is OK to grout for trash enclosures | |
12/23/2022 | ENGR Grading Final | Complete (Recurring) | Pre-grout OK | |
12/28/2022 | ENGR Grading Final | Complete (Recurring) | Pre-grout OK |