Permit: DP20-0021
Permit Details
Status:
Inspections Complete
Type:
Development Package
Address:
10696 E ESCALANTE RD
Address NEW:
10696 E ESCALANTE RD
Apply Date:
01/22/2020
Applicant:
Description:
GRADING/Private Paving - RPA Escalante, Lot 1 driveway.
Permit Reviews
Permit Number - DP20-0021
Permit Status: Inspections complete
Permit Description: GRADING/Private Paving - RPA Escalante, Lot 1 driveway.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2020 | DEV PKG | 03/05/2020 | COMPLETED |
| 03/10/2020 | DEV PKG - RESUBMITTAL | 03/24/2020 | COMPLETED |
| 12/20/2019 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 01/23/2020 | COMPLETED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: DP20-0021
Permite Description: GRADING/Private Paving - RPA Escalante, Lot 1 driveway.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Complete (Recurring) | {Activity date: 08/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} |
| 08/03/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 08/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - ) CN/ CONTRACTOR MOT ON SITE .CONTRACTOR NEED TO RESCHEDULE.} |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 01/22/2025 | ENGR - Drainage Structures | N/A | Partial Pass | Trenches are completed for toe, I will return on 01/23/25 to witness the pour |
| 01/14/2026 | ENGR Engineering Final | N/A | Not Ready | Handrail is missing along driveway across wash. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: DP20-0021
Permit Description: GRADING/Private Paving - RPA Escalante, Lot 1 driveway.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2025 | ENGR - Drainage Structures | Passed | ||
| 12/16/2025 | ENGR Grading Final | Passed | ||
| 01/14/2026 | PDSD Site/Engineering Division - NPPO | Passed | Native plants are present in the mitigation area in accordance with approved plans. | |
| 01/30/2026 | ENGR Paving | Passed | Paving is completed in accordance with approved plans. | |
| 06/12/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |