Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP20-0021

Parcel: 136450010

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
01/10/2025 ENGR - Drainage Structures Partial Pass
01/22/2025 ENGR - Drainage Structures Partial Pass Trenches are completed for toe, I will return on 01/23/25 to witness the pour
01/31/2025 ENGR - Drainage Structures Partial Pass Consultation
02/10/2025 ENGR - Drainage Structures Partial Pass Top walls at each side of drive line, 02/10/25
02/19/2025 ENGR - Drainage Structures Partial Pass Side walls with rip rap are being completed 02/19/25
12/16/2025 ENGR - Drainage Structures Passed