Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
|
| 01/22/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Trenches are completed for toe, I will return on 01/23/25 to witness the pour |
| 01/31/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Consultation |
| 02/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Top walls at each side of drive line, 02/10/25 |
| 02/19/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Side walls with rip rap are being completed 02/19/25 |
| 12/16/2025 |
ENGR - Drainage Structures |
|
Passed |
|