Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1903 E SPEEDWAY BL
Apply Date:
01/16/2020
Applicant:
Lisa Bowers
Description:
SITE - Chipotle Mexican Grill, exterior patio seating.

Permit Reviews

Permit Number - DP20-0018
Permit Status: Complete
Permit Description: SITE - Chipotle Mexican Grill, exterior patio seating.
Start Date Submittal Complete Date Status  
01/16/2020 DEV PKG - OK TO SUBMIT 01/21/2020 COMPLETED Review Details
01/21/2020 DEV PKG 01/31/2020 COMPLETED Review Details
03/12/2021 DEV PKG - OK TO SUBMIT 03/18/2021 COMPLETED Review Details
03/18/2021 REVISION - - 1ST 04/07/2021 COMPLETED Review Details
09/14/2020 DEV PKG - RESUBMITTAL 10/29/2020 COMPLETED Review Details
11/30/2020 DEV PKG - RESUBMITTAL 12/03/2020 COMPLETED Review Details
12/14/2020 DEV PKG - RESUBMITTAL 01/04/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0018
Permit Description: SITE - Chipotle Mexican Grill, exterior patio seating.
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/01/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/01/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 02/26/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - Approved. Unscheduled courtesy inspection for Mark at 714-231-4015. Contractor installing new walkways and patio adjacent Two building. Provide sidewalk scuppers as needed. Walkways shall not exceed 2% cross slope. Coordinate all final inspections with building permit.}
03/03/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 03/03/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - APPROVED}
04/22/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/22/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - }
04/27/2021 COT - ENGR - Signage Final Passed {Activity date: 04/27/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - }
05/27/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/27/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/28/2021 ENGR Grading Final Passed {Activity date: 05/28/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 05/20/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 05/14/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No progress in parking area since last inspection. Large piles of material and debris still remain on site.
} ; {Activity date: 04/16/2021; Status: Denied; Inspector: BBENEDON; Comment: Entered by VLEON1 - Denied. Existing concrete ramp and new accessible route at connection to existing exceeds maximum allowable cross slope. Existing accessible parking spaces exceed maximum allowable slope. Mark with KDC.} ; {Activity date: 04/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Grading. Materials and debris stock piles on site. Temporary fencing still in place. No issues or concerns at this time} ; {Activity date: 03/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Curbs in drive-through area} ; {Activity date: 03/12/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Façade work in progress. Temporary fencing along perimeter.} ; {Activity date: 03/03/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Provide sidewalks cover for main rain leader at sidewalk next to the building As required in the unified development code 7.6.4.} ; {Activity date: 03/02/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Mark request sidewalks copper code requirement information. Provided e mail} ; {Activity date: 03/01/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, LOOKED AT THE SITE AND HAVE SCHEDULED AN ADDITIONAL INSPECTION FOR THE STORMWATER INSPECTION FOR TOMORROW. THIS SITE WILL HAVE ADDITIONAL INSPECTIONS PERFORMED TOMORROW TO SEE WHAT NEEDS TO BE ADDRESSED PRIOR TO THE FINAL.} ; {Activity date: 02/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Contractor installing sidewalk on the west side of building. Mark was informed that a sidewalk scupper is required when applicable

}
06/15/2021 SITE - Stormwater Final Inspection Passed {Activity date: 06/15/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - }
04/29/2022 ENGR Engineering Final Passed {Activity date: 04/29/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/28/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Inspector has no issues it would prevent the issuance of a temporary certificate occupancy

} ; {Activity date: 05/27/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/29/2022 SITE - Stormwater Follow-up Passed {Activity date: 04/29/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/14/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No issues at this time. Material stock piles appear to be contained within the site

} ; {Activity date: 04/16/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No issues or concerns at this time. Controls are in place.} ; {Activity date: 04/13/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. Material stock piles on site} ; {Activity date: 04/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Grading. Materials and debris stock piles on site. Temporary fencing still in place. No issues or concerns at this time} ; {Activity date: 03/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No issues or concerns. Temporary fencing installed.} ; {Activity date: 03/18/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No issues or concerns at this time. Controls are in place.} ; {Activity date: 03/03/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 03/02/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUE NO CONCERNS AT THIS TIME}

Documents

File Name Document Type  
REVISION LETTER, 03.09.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 03.09.21 AT 2;49PM.PDF DOCUMENTS VIEW
1-15 OF 15.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 12.14.20.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 11.30.20.PDF DOCUMENTS VIEW
PIMA COUNTY CONSOLIDATION REQUEST FORM.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 09.14.20.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW