Permit: DP20-0018

Parcel: Unknown


Addresses:

1903 E SPEEDWAY BL

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
02/26/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 - APPROVED
05/27/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/27/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/28/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 -
05/20/2021 ENGR Grading Final MHERNANDEZ Partial Approval Entered by VLEON1 -
05/14/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. No progress in parking area since last inspection. Large piles of material and debris still remain on site.
04/16/2021 ENGR Grading Final BBENEDON Denied Entered by VLEON1 - Denied. Existing concrete ramp and new accessible route at connection to existing exceeds maximum allowable cross slope. Existing accessible parking spaces exceed maximum allowable slope. Mark with KDC.
04/08/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Grading. Materials and debris stock piles on site. Temporary fencing still in place. No issues or concerns at this time
03/26/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Curbs in drive-through area
03/12/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Façade work in progress. Temporary fencing along perimeter.
03/03/2021 ENGR Grading Final BBENEDON Not ready for Inspection Entered by VLEON1 - Not ready. Provide sidewalks cover for main rain leader at sidewalk next to the building As required in the unified development code 7.6.4.
03/02/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Mark request sidewalks copper code requirement information. Provided e mail
03/01/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED, LOOKED AT THE SITE AND HAVE SCHEDULED AN ADDITIONAL INSPECTION FOR THE STORMWATER INSPECTION FOR TOMORROW. THIS SITE WILL HAVE ADDITIONAL INSPECTIONS PERFORMED TOMORROW TO SEE WHAT NEEDS TO BE ADDRESSED PRIOR TO THE FINAL.
02/26/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Contractor installing sidewalk on the west side of building. Mark was informed that a sidewalk scupper is required when applicable