Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/26/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by VLEON1 - APPROVED |
| 05/27/2021 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 05/27/2021 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 05/28/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by VLEON1 - |
| 05/20/2021 |
ENGR Grading Final |
MHERNANDEZ |
Partial Approval |
Entered by VLEON1 - |
| 05/14/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. No progress in parking area since last inspection. Large piles of material and debris still remain on site.
|
| 04/16/2021 |
ENGR Grading Final |
BBENEDON |
Denied |
Entered by VLEON1 - Denied. Existing concrete ramp and new accessible route at connection to existing exceeds maximum allowable cross slope. Existing accessible parking spaces exceed maximum allowable slope. Mark with KDC. |
| 04/08/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Grading. Materials and debris stock piles on site. Temporary fencing still in place. No issues or concerns at this time |
| 03/26/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Curbs in drive-through area |
| 03/12/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Façade work in progress. Temporary fencing along perimeter. |
| 03/03/2021 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by VLEON1 - Not ready. Provide sidewalks cover for main rain leader at sidewalk next to the building As required in the unified development code 7.6.4. |
| 03/02/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Mark request sidewalks copper code requirement information. Provided e mail |
| 03/01/2021 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by VLEON1 - CONTINUED, LOOKED AT THE SITE AND HAVE SCHEDULED AN ADDITIONAL INSPECTION FOR THE STORMWATER INSPECTION FOR TOMORROW. THIS SITE WILL HAVE ADDITIONAL INSPECTIONS PERFORMED TOMORROW TO SEE WHAT NEEDS TO BE ADDRESSED PRIOR TO THE FINAL. |
| 02/26/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Contractor installing sidewalk on the west side of building. Mark was informed that a sidewalk scupper is required when applicable
|