Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
01/14/2020
Applicant:
Description:
ROUGH GRADING - MJI Industrial.

Permit Reviews

Permit Number - DP20-0015
Permit Status: Issued
Permit Description: ROUGH GRADING - MJI Industrial.
Start Date Submittal Complete Date Status  
01/14/2020 DEV PKG - OK TO SUBMIT (GRADING ONLY) 01/15/2020 COMPLETED Review Details
01/15/2020 GRADING 01/15/2020 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP20-0015
Permite Description: ROUGH GRADING - MJI Industrial.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Follow-up N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/26/2022 SITE - Stormwater Setup and Controls N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP20-0015
Permit Description: ROUGH GRADING - MJI Industrial.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/10/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/10/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved Peter at269-9895. Property owner. Provide 9 inches of water harvesting as shown. Long-term bicycle parking only required. Rainwater into landscaped area on south side of building. Install trash enclosure per detail 601 as provided. Call for rebar inspection of pre-slab when ready. Remove any dirt accumulation into the street as necessary. Install temporary address for site.

} ; {Activity date: 09/03/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Courtesy inspection for Peter at 269-9895. Owner builder. Please schedule a preconstruction meeting as required.

}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
1-9 OF 9.PDF DEVELOPMENT PACKAGE VIEW