Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/10/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved Peter at269-9895. Property owner. Provide 9 inches of water harvesting as shown. Long-term bicycle parking only required. Rainwater into landscaped area on south side of building. Install trash enclosure per detail 601 as provided. Call for rebar inspection of pre-slab when ready. Remove any dirt accumulation into the street as necessary. Install temporary address for site.
|
| 09/03/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Courtesy inspection for Peter at 269-9895. Owner builder. Please schedule a preconstruction meeting as required.
|