Permit: DP20-0015

Parcel: 107020090

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
09/10/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by JSCHNEI2 - Approved Peter at269-9895. Property owner. Provide 9 inches of water harvesting as shown. Long-term bicycle parking only required. Rainwater into landscaped area on south side of building. Install trash enclosure per detail 601 as provided. Call for rebar inspection of pre-slab when ready. Remove any dirt accumulation into the street as necessary. Install temporary address for site.
09/03/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Courtesy inspection for Peter at 269-9895. Owner builder. Please schedule a preconstruction meeting as required.