Permit: DP19-0276
Permit Details
Status:
Complete
Type:
Development Package
Address:
5450 E LITTLETOWN RD
Address NEW:
5450 E LITTLETOWN RD
Apply Date:
11/06/2019
Applicant:
Blake Junak
Description:
SITE/GRADING/SWPPP - Dollar General.
Permit Reviews
Permit Number - DP19-0276
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Dollar General.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2020 | DEV PKG - RESUBMITTAL | 03/19/2020 | COMPLETED |
| 07/27/2020 | DEV PKG - OK TO SUBMIT | 08/26/2020 | COMPLETED |
| 08/26/2020 | REVISION - - 1ST | 08/27/2020 | COMPLETED |
| 10/08/2019 | DEV PKG - OK TO SUBMIT | 11/07/2019 | COMPLETED |
| 11/07/2019 | DEV PKG | 12/17/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0276
Permit Description: SITE/GRADING/SWPPP - Dollar General.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/16/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 08/26/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/26/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } | |
| 08/26/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/26/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/11/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Talked with GC about cleaning up concrete washout and construction debris on south east side of building.} | |
| 08/26/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/26/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, THE CONTROLS HAVE BEEN INSTALLED THROUGHOUT THE SITE, CONTRACTOR WAS ADVISED TO MODIFY THEIR TRACK OUT ROCK INTO THE SITE SO THAT IT IS WIDE ENOUGH. } |
|
| 08/26/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 08/26/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } | |
| 08/31/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/31/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 08/26/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Plant count OK. Install water harvesting and landscaped areas per approved plans and keynotes. } |
|
| 08/31/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/31/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} | |
| 09/17/2020 | ENGR Engineering Final | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 09/04/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. Still OK for TCO. Complete all stabilization of disturbed soil during construction around building. Met with GC went over what needs to be stabilized and how.} ; {Activity date: 09/02/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Partial approval. TCO still OK. Complete all notes from 8-31-2020. Before calling for grading final.} ; {Activity date: 08/31/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. OK for TCO only. Complete all grading work. Talked with Kevin engineer of record to provide certification letter for all water harvesting and drainage areas for changes OK by Andy Connor. Complete for final.} ; {Activity date: 08/27/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Talked with engineer of record on phone yesterday about making changes to water harvesting to be able to achieve capturing the amount of waterNeeded. Talked with Andy Connor about excepting a certification letter from engineer of record for those changes he said he was OK with that. Talked with superintendent on site making sure he understood landscaped area still needs to capture water. } ; {Activity date: 08/26/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all work on approved plans. Provide COT Approved revisions for any changes to approve plans.} ; {Activity date: 08/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Talked with GC about providing COT approved Revisions for all changes to approved plans. Provide stabilization to all disturbed areas during construction. List not complete. } |
|
| 09/17/2020 | ENGR Grading Final | Passed | {Activity date: 09/17/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } |