Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0276
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
| 07/01/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - IS CONTINUED AT THIS TIME, CREWS ARE WORKING MOSTLY ON GOING VERTICAL AND POURING THE CONCRETE FOR THE TRASH ENCLOSURE. |
| 08/26/2020 | ENGR Grading Final | Rledonne | Approved | Entered by RLEDONN1 - |
| 07/01/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - IS PARTIAL, OK TO POUR THE FLOOR SLAB AND SURROUNDING CONCRETE. |
| 06/30/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by JSCHNEI2 - INSPECTION GRADING REBAR IS PARTIAL AT THIS TIME, OK FOR THE POURING OF THE FLOOR AND THE SURROUNDING AREAS. PROVIDE PHOTOS LATER TODAY SHOWING THE REBAR MAT IS UP ON CHAIRS, AND PHOTOGRAPHS OF THE BOLLARDS BEFORE AND AFTER THEIR FOOTERS ARE POURED. |
| 06/19/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - S CONTINUED AT THIS TIME, THE WALLS HAVE BEEN CONSTRUCTED AND GROUTED, EXCESS GROUT HAS BEEN REMOVED AT THE BASE. THEY WILL BE WORKING ON INSTALLING THE BOLLARDS IN THE FUTURE, THE POURING THE FLOOR, AND INSTALLING THE GATES. |
| 06/15/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. FaceTime inspection for footers for trash enclosure rebar OK and footers only. |
| 09/17/2020 | ENGR Grading Final | rledonne | Approved | Entered by RLEDONN1 - |
| 09/17/2020 | ENGR Grading Final | rledonne | Approved | Entered by RLEDONN1 - |
| 08/20/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity at this time working on sidewalks and curbs in right away. |
| 08/11/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Checked ADA parking and sidewalks on east and north side of building only. Provide COT approved as Built for all changes to approve plans before final. |
| 08/10/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Working on laying asphalt in parking area. And sidewalks in right away. |
| 08/06/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Working on laying down AB getting ready to pave in parking area. |
| 07/14/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Working on curbing and in Right of way. |
| 06/22/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Grading work around building bringing in import dirt working on sidewalks in right away. |