Permit: DP19-0276

Parcel: Unknown

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP19-0276

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/26/2020 ENGR Engineering Final Rledonne Approved Entered by RLEDONN1 -
09/17/2020 ENGR Engineering Final RLEDONNE Approved Entered by RSALDAT1 - Approved.
09/04/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by RSALDAT1 - Partial approval. Still OK for TCO. Complete all stabilization of disturbed soil during construction around building. Met with GC went over what needs to be stabilized and how.
09/02/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by JSCHNEI2 - Partial approval. TCO still OK. Complete all notes from 8-31-2020. Before calling for grading final.
08/31/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by RSALDAT1 - Partial approval. OK for TCO only. Complete all grading work. Talked with Kevin engineer of record to provide certification letter for all water harvesting and drainage areas for changes OK by Andy Connor. Complete for final.
08/27/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RSALDAT1 - Not ready. Talked with engineer of record on phone yesterday about making changes to water harvesting to be able to achieve capturing the amount of waterNeeded. Talked with Andy Connor about excepting a certification letter from engineer of record for those changes he said he was OK with that. Talked with superintendent on site making sure he understood landscaped area still needs to capture water.
08/26/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Complete all work on approved plans. Provide COT Approved revisions for any changes to approve plans.
08/11/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RSALDAT1 - Not ready. Talked with GC about providing COT approved Revisions for all changes to approved plans. Provide stabilization to all disturbed areas during construction. List not complete.