Permit: DP19-0255
Permit Details
Apply Date:
10/17/2019
Applicant:
Araceli Juarez
Description:
SITE/GRADING - Airgas Parking Lot expansion.
Permit Reviews
Permit Number - DP19-0255
Permit Status: Complete
Permit Description: SITE/GRADING - Airgas Parking Lot expansion.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2019 | DEV PKG - OK TO SUBMIT | 10/22/2019 | COMPLETED |
| 10/22/2019 | DEV PKG | 11/12/2019 | COMPLETED |
| 11/15/2019 | DEV PKG - RESUBMITTAL | 12/04/2019 | COMPLETED |
| 12/10/2019 | DEV PKG - RESUBMITTAL | 12/10/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0255
Permit Description: SITE/GRADING - Airgas Parking Lot expansion.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/16/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/16/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/16/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/16/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 01/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/21/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/21/2020 | ENGR Engineering Final | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/16/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the requirements stated in the locks holds and notices Correct the installation of the accessible parking sign and correct the broken asphalt within the accessible path. Work within the right of way requires permits and inspections.} |
|
| 01/21/2020 | ENGR Grading Final | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 01/21/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } |