Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/21/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/16/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the requirements stated in the locks holds and notices
Correct the installation of the accessible parking sign and correct the broken asphalt within the accessible path.
Work within the right of way requires permits and inspections. |
| 01/21/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/16/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the requirements stated in the locks holds and notices
Correct the installation of the accessible parking sign and correct the broken asphalt within the accessible path.
Work within the right of way requires permits and inspections. |