Permit: DP19-0229
Permit Details
Apply Date:
09/26/2019
Applicant:
Description:
GRADING - Nelson Mobile Home Estates II, Lots 1-11. Common Areas "A" (landsc area), "B" (landsc bord
Permit Reviews
Permit Number - DP19-0229
Permit Status: Complete
Permit Description: GRADING - Nelson Mobile Home Estates II, Lots 1-11. Common Areas "A" (landsc area), "B" (landsc bord
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/27/2019 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 10/01/2019 | COMPLETED |
10/01/2019 | DEV PKG | 11/01/2019 | COMPLETED |
11/06/2019 | DEV PKG - RESUBMITTAL | 11/22/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0229
Permit Description: GRADING - Nelson Mobile Home Estates II, Lots 1-11. Common Areas "A" (landsc area), "B" (landsc bord
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
12/19/2019 | ENGR Grading Final | Passed | {Activity date: 12/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
12/19/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
12/19/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
12/19/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Clyde, owner. Robert builder at 481-5987. Complete the work shown on the development package plan clean up any overgrowth and debris. Call for final inspections when ready.} | |
04/20/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas.} | |
04/20/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas.} | |
04/20/2020 | ENGR Engineering Final | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/13/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Notes from engineering final apply to grading final.} ; {Activity date: 12/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas.} | |
04/20/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas.} |