Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - NPPO
Permit Number - DP19-0229
Inspection Description - PDSD Site/Engineering Division - NPPO
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2020 | PDSD Site/Engineering Division - NPPO | BBENEDON | Approved | Entered by RSALDAT1 - |
12/19/2019 | PDSD Site/Engineering Division - NPPO | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas. |