Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 02/13/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete notes from last inspection check sidewalks for cross slopes not to exceed 2%. |
| 12/19/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas. |
| 04/20/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 02/13/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Notes from engineering final apply to grading final. |
| 12/19/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the sidewalks and pavement as shown on the plan. Check sidewalk for maximum cross slope. Clean up construction debris and overgrowth from drainage areas. |