Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP19-0226
Permit Details
Status:
Issued
Type:
Development Package
Address:
215 S SENTINEL PEAK RD
Address NEW:
215 S SENTINEL PEAK RD
Apply Date:
09/24/2019
Applicant:
Description:
TENTATIVE PLAT/GRADING/FLD - Sentinel Vista, Lots 1-11, CA "A" (priv road and parking), CA "B" (land
Permit Reviews
Permit Number - DP19-0226
Permit Status: Issued
Permit Description: TENTATIVE PLAT/GRADING/FLD - Sentinel Vista, Lots 1-11, CA "A" (priv road and parking), CA "B" (land
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/11/2021 | REVISION - - 1ST | 01/11/2021 | COMPLETED |
| 01/15/2021 | REVISION - - 1ST | 04/07/2021 | COMPLETED |
| 01/21/2020 | TENTATIVE PLAT REVIEW | 03/02/2020 | COMPLETED |
| 03/20/2020 | TENTATIVE PLAT REVIEW | 04/21/2020 | COMPLETED |
| 05/19/2020 | TENTATIVE PLAT REVIEW | 06/10/2020 | COMPLETED |
| 06/17/2020 | TENTATIVE PLAT REVIEW | 07/13/2020 | COMPLETED |
| 08/23/2019 | DEV PKG - OK TO SUBMIT | 09/30/2019 | COMPLETED |
| 09/30/2019 | TENTATIVE PLAT REVIEW | 10/31/2019 | COMPLETED |
| 11/30/2020 | DEV PKG - OK TO SUBMIT | 01/11/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0226
Permite Description: TENTATIVE PLAT/GRADING/FLD - Sentinel Vista, Lots 1-11, CA "A" (priv road and parking), CA "B" (land
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 05/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Provide Concrete containment as needed} ; {Activity date: 10/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Controls in place.} ; {Activity date: 07/14/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. New Stormwater controls are necessary at basin overflow during construction.} ; {Activity date: 12/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No controls installed.} ; {Activity date: 11/12/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. Track out protection installed} |
| 10/19/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 10/19/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Trash accumulation offsite along north and east perimeter.} ; {Activity date: 09/29/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues after last rain event} ; {Activity date: 09/14/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No track out issues at this time. Construction Ongoing } ; {Activity date: 08/03/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. All materials are contained within site.} ; {Activity date: 06/29/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continue. No issues or concerns at this time. } ; {Activity date: 06/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - continues} ; {Activity date: 06/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. All materials contained within the site. } ; {Activity date: 04/28/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. All materials contained within site boundaries} ; {Activity date: 04/01/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued no issues or concerns at this time } ; {Activity date: 03/03/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues at this time } ; {Activity date: 02/02/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 01/21/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 01/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No activity on site } ; {Activity date: 12/10/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues after last nights rain event} ; {Activity date: 12/01/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 10/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues at this time. Building construction in progress} ; {Activity date: 10/07/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Continued.} ; {Activity date: 10/07/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Continued.} ; {Activity date: 09/30/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No offsite discharge noted with a conclusion of this year’s monsoon } ; {Activity date: 08/19/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues or concerns at this time after last rain event} ; {Activity date: 07/14/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Erosion control is needed at basin overflow overflow} ; {Activity date: 05/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE NO ISSUSES OR CONCERNS AT THIS TIME} ; {Activity date: 04/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE MINOR TRACK OUT NOTED NO ISSUE OR CONCERNS AT THIS TIME} ; {Activity date: 04/16/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continue. Minor noted at this time. Grading in progress} ; {Activity date: 03/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE NO ISSUES AT THIS TIME} ; {Activity date: 02/10/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE - NO ISSUES OR CONCERNS AT THIS TIME} ; {Activity date: 01/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE - NO ISSUES AFTER LAST RAIN EVENT} ; {Activity date: 01/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. Very little activity on site} ; {Activity date: 01/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 12/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues or concerns at this time.} ; {Activity date: 12/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continued. Minor track out noted.} ; {Activity date: 11/24/2020; Status: Continued; Inspector: BBENENDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/12/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Minor track out noted at two entrances} |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 09/08/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | |
| 03/21/2024 | SITE - Stormwater Final Inspection | N/A | Not Applicable | It’s a new decade, let’s move forward. |
| 11/28/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 11/28/2023 | ENGR Grading Final | N/A | Partial Pass | grading for upper |
| 04/03/2025 | ENGR Engineering Final | N/A | Not Ready | Conducted site visit with Chad Keller-Landscape Architect, and Jesus Villezcas-DTM Engineering. Site requires revision to Development Package to address landscaping changes, and sidewalk modification. Instructed to submit a substitute assurance agreement to prevent expiration of assurance agreement. |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0226
Permit Description: TENTATIVE PLAT/GRADING/FLD - Sentinel Vista, Lots 1-11, CA "A" (priv road and parking), CA "B" (land
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2024 | ENGR Grading Final | Passed | This is a duplicate inspection approved for clarity |