Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 04/03/2025 |
ENGR Engineering Final
|
|
Not Ready |
Conducted site visit with Chad Keller-Landscape Architect, and Jesus Villezcas-DTM Engineering. Site requires revision to Development Package to address landscaping changes, and sidewalk modification. Instructed to submit a substitute assurance agreement to prevent expiration of assurance agreement. |
| 05/30/2023 |
ENGR Engineering Final
|
|
Not Ready |
TALKED WITH ALEX TO DISCUSS WHERE HE IS AT IN THE CONSTRUCTION PROCESS, AN INSPECTION WILL BE SCHEDULED FOR THURSDAY WHEN I RETURN BACK TO WORK |