Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0226

Parcel: 116214620

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP19-0226

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
06/15/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. No activity on site at this time. Temporary fencing installed. Material stock piles of each lot.
05/07/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Work within the right of way. Transportation on site. Site paving and curb work in progress
01/08/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Still no activity on site due to changes. Heavy equipment and temporary toilet facilities remain
08/11/2022 ENGR Grading Final Complete (Recurring) {Activity date: 08/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Building progress only at this time} ; {Activity date: 07/20/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Five of the 11 buildings under construction at this time. Please schedule inspections biweekly} ; {Activity date: 07/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 06/23/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. New building start on site. Building construction only at this time. No site work at this time

} ; {Activity date: 06/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continue. Building progress at Northwest portion of site.} ; {Activity date: 06/02/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No grading activity at this time. Large material stock piles remain on site. Building construction progress only} ; {Activity date: 05/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Contractor installing building slab

} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - PARTIAL AT THIS TIME, LOOKED OVER THE WORK THAT IS HAPPENING AT THIS TIME WHICH IS MAINLY VERTICAL. THEY WILL BE LOOKING FOR A LOT RELEASE IN THE NEAR FUTURE.} ; {Activity date: 04/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Excavation work in progress fourth home site

} ; {Activity date: 10/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Building construction has resume} ; {Activity date: 08/25/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Building construction in progress. Material and debris piles remain on site temporary fencing in place.} ; {Activity date: 07/28/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Building progress only, no site work at this time.} ; {Activity date: 07/21/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. First building construction started} ; {Activity date: 07/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Survey crew on site} ; {Activity date: 07/07/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Survey work progress} ; {Activity date: 06/10/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME.I MET ON THE SITE WITH THE CONTRACTOR AND THE OWNERS REPRESENTATIVE TO LOOK OVER THE ADA PEDESTRIAN CROSS WALK THAT HAD BEEN NOTED AS NON-COMPLIANT. WE CHECKED IN 3 DIFFERENT LOCATIONS AND EVERYTHING WAS LESS THAN 2% IN THE CROSS SLOPE.} ; {Activity date: 05/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Rough grading mostly complete. Several material stock piles remain on site and small debris piles. Temporary fencing in place.} ; {Activity date: 05/24/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME, SITE VISIT ONLY TO LOOK AT ADA ISSUES OFR THIS SITE AND SEE IF THEY HAVE BEEN ADDRESSED IN A COMPLIANT MANNER. THE ENTRANCE WAYS INTO THE SITE HAVE BEEN CHECKED FOR THE CROSS-SLOPE COMPLIANCE OF LESS THAN 2% CROSS SLOPE AND NO MORE THAN 5% IN THE RUNNING SLOPE, BOT FAILED. THIS INSPECTION WILL BE RESCHEDULED FOR 5/27/21 SO THAT WE CAN CALIBRATE ALL EQUIPMENT FOR A FINAL INSPECTION. ALSO IT HAS BEEN NOTED DURING THIS INSPECTION THE APPROVED ADA PARKING SPACE AND ACCESS AISLE HAVE BEEN ELIMINATED FROM THE APPROVED AREA THAT WAS NON C OMPLIANT FOR OVER ALL SLOPE. IT IS BEING PLACED INTO AN AREA THAT SHOULD BE COMPLIANT FOR CROSS SLOPE NORTH OF LOT #5, BUT THIS AREA IS A DRAINAGE WAY OUTLET FOR MOST OF THE SITE INTO THE ADJACENT PROPERTY EAST AND NORTH OF THIS AREA.} ; {Activity date: 05/18/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. Paving complete} ; {Activity date: 04/29/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Final grading, curbs and work in right of way.} ; {Activity date: 04/13/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Grading and curb installation. Temporary fencing has been installed.} ; {Activity date: 03/24/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Work has resumed on site, utility modifications} ; {Activity date: 03/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue surveyor on site.} ; {Activity date: 02/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Material piles, construction debris and equipment on site. No change since last inspection} ; {Activity date: 02/03/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No activity on site at this time. Temporary toilet facilities remain. Material stock piles and debris piles and tools remain on site} ; {Activity date: 01/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Plan in revision status. No activity on site at this time.} ; {Activity date: 01/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractors installing Rockwall. Heavy equipment has been removed from the site} ; {Activity date: 01/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No activity on site at this time. Large equipment and materials stored on site} ; {Activity date: 12/30/2020; Status: Cancelled; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No activity on site. Construction equipment and temporary toilet still remain, additionally there is a hole at South entrance pending utility work.

} ; {Activity date: 12/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. No activity on the site at this time. Heavy equipment still on site.} ; {Activity date: 12/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.No activity on site at this time due to pending plan revisions.

} ; {Activity date: 12/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Rough grading mostly complete. No activity on site at this time} ; {Activity date: 12/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Rough grading and electrical utility work} ; {Activity date: 12/02/2020; Status: Continued; Inspector: BENEDON; Comment: Entered by PAHUMAD1 - Continued. Utility work in progress

} ; {Activity date: 11/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Grading and utility work} ; {Activity date: 11/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Utility work in progress} ; {Activity date: 11/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Rough grading within existing perimeter retaining walls.} ; {Activity date: 11/09/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WORK HAS STARTED ON THIS SITE BUT NO INSPECTIONS HAVE BEEN SCHEDULED. I MET WITH JACOB WAREHAM / PREMIER BUILDING GROUP AND WE DISCUSSED THE ON GOING WORK, SWPPP REQUIREMENTS, AND FUTURE INSPECTIONS. HE SAYS THAT THEY HAVE A GRADING INTERMEDIATE SCHEDULED FOR TOMORROW, BUT NO PRE-CON. WE DISCUSSED SOME ISSUES ON THIS SITE FOR THE ADA SLOPES, RUNNING AND CROSS SLOPES. WE ALSO LOOKED AT THE SITE TO SEE WHAT ISSUES NEED TO BE LOOKED AT IN OR NE
03/21/2024 ENGR Grading Final Partial Pass Five structures have been completed and appeared to be occupied. No activity on site at this time. Construction materials and debris are contained with contemporary fencing. Graded lots are unstabilized at this time.
06/25/2024 ENGR Grading Final Passed This is a duplicate inspection approved for clarity
06/28/2023 ENGR Grading Final Complete (Recurring) excavation at upper pad area in place. Lower portion of site nearing completion.
08/10/2023 ENGR Grading Final Partial Pass no new grading activity at this time. Un- graded area, separated with temporary fencing.
11/28/2023 ENGR Grading Final Partial Pass grading for upper