Permit: DP19-0224
Permit Details
Apply Date:
09/23/2019
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - Dutch Bros at The Bridges, drive-thru coffee shop.
Permit Reviews
Permit Number - DP19-0224
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Dutch Bros at The Bridges, drive-thru coffee shop.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/22/2019 | DEV PKG - OK TO SUBMIT | 09/25/2019 | COMPLETED |
09/26/2019 | DEV PKG | 10/30/2019 | COMPLETED |
11/12/2019 | DEV PKG - RESUBMITTAL | 12/16/2019 | COMPLETED |
12/17/2019 | DEV PKG - RESUBMITTAL | 12/19/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0224
Permit Description: SITE/GRADING/SWPPP - Dutch Bros at The Bridges, drive-thru coffee shop.
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/25/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Mike with Chase building team at 390-5542. No SWPPP needed, site is under an acre. There are no catch basins or below ground piping shown on plan cording to Mike. Provide protections at east property line drainage canal. Please remove all track out at the end of each day. Please schedule stormwater control and follow up inspections. Schedule inspections for walkways curbs and pavement. Over Ex at Water harvesting areas to ensure minimum 6 inches below water entry/curb cut.} ; {Activity date: 03/24/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Mike with Chase building team please schedule inspections from your development package permit as required.} | |
06/16/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor installing pavement. Mike with Chase builders} ; {Activity date: 06/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor installing pavement. Mike with Chase builders} ; {Activity date: 05/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Some track out noted. Mike will have it swept up by the end of today’s work.} ; {Activity date: 05/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Notable track out due to material hauling. Mike is shoveling and brooming as needed and will hose down area after material export. } ; {Activity date: 03/27/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - There’s minor track out to be noted at this time.} ; {Activity date: 03/26/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No track out on Kino however there is still track out in parking lot and thorough fare of existing neighboring business.} ; {Activity date: 03/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Some track out noted in neighboring lot and on S. Kino Blvd.} |
|
06/16/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Track out protection is in place.} | |
06/17/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/17/2020 | ENGR Grading Final | Passed | {Activity date: 06/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/17/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 06/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/18/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/17/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. OK for TCO} | |
06/18/2020 | SITE - Zoning Final | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: AHINES2; Comment: Entered by AHINES2 - } ; {Activity date: 06/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Comply with the notes left by plan review were Alex Hines inPRO.} ; {Activity date: 12/16/2019; Status: Prior to Final Inspectn; Inspector: ahines2; Comment: Entered by AHINES2 - Submit revision to address TAA comment 12/5/19: conditions shall be identified in the general notes of the revised development plan unless FAA staff with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) has provided the applicant with written confirmation that filing FAA Form 7460 is not required.} | |
06/18/2020 | ENGR Engineering Final | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/17/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. OK for TCO} | |
06/18/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } |