Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP19-0224
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2020 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by SFLORES2 - Mike with Chase building team at 390-5542. No SWPPP needed, site is under an acre. There are no catch basins or below ground piping shown on plan cording to Mike. Provide protections at east property line drainage canal. Please remove all track out at the end of each day. Please schedule stormwater control and follow up inspections. Schedule inspections for walkways curbs and pavement. Over Ex at Water harvesting areas to ensure minimum 6 inches below water entry/curb cut. |
03/24/2020 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Mike with Chase building team please schedule inspections from your development package permit as required. |