Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP19-0187
Permit Details
Apply Date:
08/06/2019
Applicant:
Description:
GRADING/SWPPP - Arizona Self Storage at Rio Verde Village.
Permit Reviews
Permit Number - DP19-0187
Permit Status: Complete
Permit Description: GRADING/SWPPP - Arizona Self Storage at Rio Verde Village.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2019 | DEV PKG - OK TO SUBMIT | 08/09/2019 | COMPLETED |
| 07/28/2022 | DEV PKG - OK TO SUBMIT | 08/25/2022 | COMPLETED |
| 08/12/2019 | DEV PKG | 09/10/2019 | COMPLETED |
| 08/25/2022 | REVISION - - 1ST | 08/30/2022 | COMPLETED |
| 09/25/2019 | DEV PKG - RESUBMITTAL | 10/28/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP19-0187
Permite Description: GRADING/SWPPP - Arizona Self Storage at Rio Verde Village.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2022 | SITE - Stormwater Final Inspection | N/A | Complete (Recurring) | {Activity date: 07/19/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Please submit copy of your state of Arizona not to City of Tucson} ; {Activity date: 06/02/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Provide a copy of NOT for final approval. Mike With Canyon} ; {Activity date: 03/31/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Provide NOT For final approval. Complete all remaining drainage work and remove all temporary controls prior to scheduling final inspections } |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0187
Permit Description: GRADING/SWPPP - Arizona Self Storage at Rio Verde Village.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/30/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 12/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Conversation with Mike With Canyon builders 549-7635. Contractor making preparations ahead of weather event. Additionally contractor will clean the drainage canal as needed and stabilize all banks as project progresses.} ; {Activity date: 01/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 03/02/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Provide approved plans for stormwater controls. Install per approved plans stop grubbing until controls have been installed along wash and all Inlets. Walks site with Eaglerock Bob Mallory went over controls that need to be added. And to provide the approved set of plans.} ; {Activity date: 02/28/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO ONE ON SITE AT THIS TIME TO DISCUSS THE SITE WORK THAT WILL BE HAPPENING. WADDLE HAS BEEN PLACED ALONG THE EAST SIDE OF THE PROJECT AN NEAR THE WASH AREA.} | |
| 07/18/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/05/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS PARTIAL, COMPLETE ALL LANDSCAPING AS SHOWN ON THE APPROVED DRAWINGS OR PROVIDE THE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE. THIS INSPECTION WILL BE PERFORMED ONCE THE APPROVED PLANS ARE PROVIDED. } ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. } ; {Activity date: 07/01/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 06/23/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Note landscaping work shown along the north bank of the river south of The Project and South of the existing apartment complex. Work is shown on expired permit DP Dash 0058 } ; {Activity date: 06/02/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Ground coverings not complete at this time. Contractor starting work As shown along wash south of project.} |
|
| 07/18/2022 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/05/2022; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS NOT READY AT THIS TIME.} | |
| 07/18/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/18/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 04/28/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. Contractor removing materials from wash area south of building} ; {Activity date: 04/18/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME CREWS STILL WORKING ON COMPLETING THE DRAINAGE ASPECTS. I HAVE REMINDED CANYON DEVELOPMENT THAT WE NEED TO LOOK AT SOME OF THE DRAINAGE ASPECTS AND FINISHING UP THE PROJECT ITEMS.} ; {Activity date: 03/10/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED AT THIS TIME NO CONCERNS} ; {Activity date: 02/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.continued erosion of unprotected slopes} ; {Activity date: 01/28/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Conversation with Mike about bank protection and cleanup for final.} ; {Activity date: 01/19/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - . Continued. Unstable dirt banks still remain during construction } ; {Activity date: 01/04/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Conversation with Mike from Canyon builders. Contractor will be expected to remove all dirt bleed off from this project from the drainage canal } ; {Activity date: 12/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue. Excessive dirt remains in drainage canal south of} ; {Activity date: 12/16/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Excessive erosion on site and dirt and rocks accumulation in concrete drainage canal} ; {Activity date: 12/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Conversation with Mike With Canyon builders 549-7635. Contractor making preparations ahead of weather event. Additionally contractor will clean the drainage canal as needed and stabilize all banks as project progresses.} ; {Activity date: 12/02/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Continued} ; {Activity date: 11/10/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor offsite due to personal issues. Will reschedule for next week Mike with Canyon at} ; {Activity date: 10/27/2021; Status: Continued; Inspector: BBENEON; Comment: Entered by RSALDAT1 - . Continued} ; {Activity date: 10/14/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue.} ; {Activity date: 09/28/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor on site erosion into drainage.} ; {Activity date: 09/08/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN EVERYTHING IS WORKING PROPERLY RIIGHT NOW. } ; {Activity date: 08/18/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Significant amounts of erosion along the south west and southern portion of the building remain. Drainage bottom is full of dirt. } ; {Activity date: 08/11/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09154. Continued. Dirt remains in new concrete drainage canal under building due to construction runoff and erosion.} ; {Activity date: 08/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Spoke with Mike from Canyon about erosion and dirt accumulation in concrete drainage canal. He said he just got the backhoe and will get it taken care of} ; {Activity date: 07/29/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor erosion noted at south end of building wash.} ; {Activity date: 07/22/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Minor erosion forming at south east portion of site. Minor amounts of construction debris in drainage area } ; {Activity date: 07/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor erosion and dirt in concrete portion of drainage canal under building. Mike with Canyon Warren sure that no dirt from the job site makes it into existing waterway.} ; {Activity date: 06/24/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No issues at this time after last rain event} ; {Activity date: 06/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 05/28/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No issues or concerns } ; {Activity date: 05/17/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED NO CONCERNS AT THIS TIME} ; {Activity date: 03/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE NO ISSUED AT THIS TIME} ; {Activity date: 02/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 02/11/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE, NO ISSUES OR CONCERNS AT THIS TIME} ; {Activity date: 01/28/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE NO ISSUES AFTER RAIN EVENT} ; {Activity date: 01/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 12/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Check out contained to private Drive} ; {Activity date: 12/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Controls need to be added on drainage upper banks per conversation with Bob Mallory.} ; {Activity date: 11/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Controlled still have not been added on upper banks.} ; {Activity date: 11/17/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Talked with Bob Mallory about adding controls .On either side of drainage area. } ; {Activity date: 11/03/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Controls have still not been installed along top of Drainage area.} ; {Activity date: 10/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue Repairs have not been made no changes since last inspection. } ; {Activity date: 10/12/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by VFLORES1 - NO CONCERNS ON THIS SITE AT THIS TIME. } ; {Activity date: 10/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Controls have not been installed per conversation with superintendent for Canyon. } ; {Activity date: 09/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Talked with superintendent from Canyon he is going to get with Bob Mallory about putting stormwater Along the top of the concrete banks.} ; {Activity date: 09/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/09/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. Repairs need to be made to controls on east side of site.} ; {Activity date: 08/26/202 |
|
| 07/18/2022 | ENGR Grading Final | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/30/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved} | |
| 07/18/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/26/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Met with engineer of record grading contractor and general contractor. Provide stormwater control plan and NOI On site. Install controls before start grading.} | |
| 07/18/2022 | COT - ENGR - Signage Final | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/24/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready, Sign post not installed per plan detail. Mike With Canyon} | |
| 09/20/2023 | ENGR Engineering Final | Passed |