Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP19-0187
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 07/05/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - IS NOT READY AT THIS TIME, PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. COMPLETE ALL WORK AS SHOWN ON THE APPROVED REVISED DRAWINGS AND THEN RESCHEDULE THIS FOR REIN-SPECTION. |
| 06/22/2022 | ENGR Engineering Final | IVR USER | Cancelled | Entered by IVR USER - IVRS - RI canceled |
| 04/15/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - not ready. There is no pedestrian access to the lower portion of the building. Construction in progress within the building. One of the two accessible parking spaces is out of compliance. Water harvesting areas have not been graded to require depth. Accessible parking signs not installed per plan specifications. Additional work around the site has not been completed at this time |
| 04/08/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Paving repairs |
| 04/01/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. No parking spaces have been provided at this time. Riprap and other ground coverings have not been completed. Corrections required in and around drainage canal. Contact Dave Roberts with occupancy requests and other concerns. |
| 12/16/2021 | ENGR Engineering Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Excessive erosion on site and dirt and rocks accumulation in concrete drainage canal |
| 05/27/2021 | ENGR Engineering Final | BBENDON | Not ready for Inspection | Entered by VLEON1 - Not ready. Laydown yard south of existing structure, will require stabilization at final insp |
| 07/18/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 06/30/2022 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. |
| 04/18/2022 | ENGR Engineering Final | DROBERTS | Continued | Entered by RSALDAT1 - |
| 04/15/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - not ready. There is no pedestrian access to the lower portion of the building. Construction in progress within the building. One of the two accessible parking spaces is out of compliance. Water harvesting areas have not been graded to require depth. Accessible parking signs not installed per plan specifications. Additional work around the site has not been completed at this time |
| 09/20/2023 | ENGR Engineering Final | Passed |