| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 04/05/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Conversation with Mike With Canyon about protecting slopes above drainage canal. Request information from site engineer if not specified on plan. |
| 07/18/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 05/19/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Concrete bank reinforcement wire mesh. |
| 01/28/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VLEON1 - PARTIAL APPROVAL UPPER TROUGH DRAIN |
| 12/23/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Bank reinforcement |
| 12/23/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Concrete channel wire mesh inspection with Mike from Canyon builders |
| 12/22/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Bank reinforcement concrete channel. Mike with Canyon. |
| 08/05/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Inspection from photos sent by GC Mike. For a cut off wall on north end of channel. talked with Marty engineer of record he receivedSame photos. |
| 04/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - PHOTOS BY GC |
| 04/27/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Inspection done by photos supplied by general contractor. |
| 04/23/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Inspection for a cut off wall based off of photos sent by general contractor. |
| 04/21/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Inspection for cut off wall done by photos sent by general contractor. |
| 04/20/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Inspection based off of photos sent by general contractor. For cut off wall. |
| 04/17/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Inspection for a cut off wall per General contractors pictures. |
| 04/15/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Inspection for cut off wall per photos sent by general contractor. |
| 04/14/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - nspection for cut off wall. Based on pictures supplied by GC. |
| 04/10/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - GRADING REBAR. |
| 04/08/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - INSPECTION FOR CUT OFF WALL PER PICTURES SENT BY GC. |
| 04/07/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by VFLORES1 - Inspection for keyway and Cut off wall per pictures supplied by GC. |
| 04/03/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by VFLORES1 - INSPECTION BASED OFF PICTURES SENT BY GC |
| 04/02/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by SFLORES2 - Continue. 6 inch welded wire and toe downs installed per photos. Sent by GC |
| 03/31/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by SFLORES2 - I LOOKED AT THE FOOTER AREAS FOR THE CHANNEL THAT IS BEING CONSTRUCTED WITH THE SLOPE PROTECTION MATERIAL. THE WATER IN THE FOOTERS HAS BEEN REMOVED AND THE 6X6 WIRE MESH HAS BEEN INSTALLED, THE AREA IS READY TO BE POURED. I HAVE REMINDED THE CONTRACTOR TO ENSURE THAT THE WIRE DOES NOT TOUCH ANY OF THE SOIL WHEN IT IS POURED LATER ON TODAY. |
| 07/18/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 06/24/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VVERA1 - IS PARTIAL, WALKED THE SITE WITH MIKE TOO SEE WHAT HAS BEEN COMPLETED, DISCUSS WHAT STILL NEEDS TO BE COMPLETED, AND THE REVISIONS TO THE PLANS THAT WILL BE REQUIRED. HE WILL BE WORKING WITH THE ENGINEER OF RECORD AND THE LANDSCAPE ARCHITECT TO ENSURE THAT ALL CHANGES ARE NOTED IN THE FINAL SET OF APPROVED REVISED DRAWINGS. |
| 06/16/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - PARTIAL DISCUSSED THE REQUIREMENTS FOR THE FINAL INSPECTION |
| 05/20/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - PARTIAL, LOOKED OVER THE SITE SO THAT I CAN ADDRESS THEIR FUTURE REQUEST FOR A TCO FOR ADDITIONAL AREAS. |
| 05/18/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. Continuation of water channel below building. Wire mesh. |
| 05/12/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Chris with blue lion construction. Curb installation at southern entrance |
| 04/21/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continue. Grading Under building and along west side |
| 04/01/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Approved. Will follow up with landscaping and final ground coverings under final inspection codes. |
| 04/18/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - I HAVE WALKED THE SITE AND NOTE THE FOLLOWING: 1) GENERAL CLEANUP OF THE SITE AND REMOVE ALL EXCESS MATERIAL THAT IS NO LONGER NEEDED. 2) PLACE CONSTRUCTION SAFETY FENCE IN AREAS WHERE THE SLOPES ARE STEEPER THAN 3:1, AS WELL AS AREAS WHERE CONSTRUCTION ACTIVITY IS STILL HAPPENING. 3) INSTALL ALL LANDSCAPING ITEMS ADJACENT TO UPPER PARKING AREAS SO THAT IT IS CLEAR, CLEAN, AND FINISHED. 4) COMPLETE ALL AREAS THAT ARE ADJACENT TO THE LOWER FLOORS OF THIS BUILDING, BACKFILLING/GRADING OPEN SLOPES, DRAINAGE PIPES AND STRUCTURES, LANDSCAPE AND SLOPE PROTECTION THAT IS STILL NOT UNDER CONSTRUCTION… |
| 03/31/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - . Partially approved. Pavement patches along new section of curb at Southeast portion of building. Loading dock barrier rail. Correct damage curbing. Complete landscaping and ground stabilization. Remove all dirt and construction debris. |
| 03/17/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - . Continued. Some grouted riprap installed. Unprotected and Unstabilized slopes remain at this time. Minor erosion noted |
| 02/01/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Mike With Canyon |
| 01/04/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Contractor preparing for curb and side walk installation schedule for intermediate inspections as needed |
| 11/23/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Grading and erosion repairs |
| 09/02/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Jobsite erosion into concrete drainage canal present |
| 08/31/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No activity on site after rain event |
| 02/22/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME, MOST OF THE WORK FOR THIS SITE IS VERTICAL ON THE BUILDINGS, SITE WORK IS VERY NOMINAL. |
| 01/28/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - CONTINUE - ROUGH GRADING ALONG EAST SIDE OF DRAINAGE CANAL |
| 01/20/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Trough drain West loading dock |
| 12/18/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Backfill on west side of retaining wall. |
| 11/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. No grading activity on site at this time. |
| 10/19/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. Working on building moving dirt around the edges of sight. Waddle still has not been installed along top of banks. |
| 10/12/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by VFLORES1 - WORK ON THIS SITE IS MAINLY GOING VERTICAL WITH THE STRUCTURES. |
| 09/21/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No grading activity at this time working on building. |
| 09/15/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - continue. No grading activity at this time working on structural for building. |
| 09/03/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No grading activity at this time. |
| 08/20/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity at this time working on building. |
| 07/14/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Exporting dirt off of site. No signs of track out. |
| 06/30/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Working on building supports no grading activity at this time. |
| 06/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Working on structural pillars. No grading activity. |
| 06/17/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity at this time working on structural rebar. Met with GC on site he mentioned that Jim Burge was doing the structural inspections. |
| 06/02/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue.No grading activity at this time. |
| 05/22/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity on site at this time. |
| 05/18/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - No grading activity at this time. |
| 05/12/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - No grading activity on site at this time. |
| 05/08/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - GRADING INTERMEDIATE THE WIRK ON SITE IS STOPPED AT THIS TIME, THE WALLS OF THE CHANNELL HAS BEEN COMPLETED, CAISONS HAVE BEEN DRILLED AND THE CONTRACTOR IS WAITING FOR THE DELIVERY OF THE STEEL CAGES PRIOR TO POURING. |
| 05/05/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Working on building support. |
| 07/18/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 06/30/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by NGARCIA3 - Approved |