Permit: DP19-0166
Permit Details
Apply Date:
07/08/2019
Applicant:
Kevin Hall
Description:
SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Permit Reviews
Permit Number - DP19-0166
Permit Status: Issued
Permit Description: SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/13/2019 | DEV PKG - OK TO SUBMIT | 07/15/2019 | COMPLETED |
07/08/2019 | DEV PKG - OK TO SUBMIT | 07/09/2019 | COMPLETED |
07/16/2019 | DEV PKG | 08/05/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0166
Permite Description: SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/21/2020 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 05/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues at this time. } ; {Activity date: 05/19/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Enter not ready for all inspections. This DP is part of a larger development.} ; {Activity date: 05/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out in parking lot. } ; {Activity date: 05/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out in parking lot. } ; {Activity date: 04/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time, however there are no controls or signage in place.} |
10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0166
Permit Description: SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/11/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no controls in place.} | |
05/11/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/08/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Chris with Epstein at 481-4745. Please schedule all of your required inspections from your development package permit } ; {Activity date: 04/08/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Chris with Epstein at 481-4745. Please schedule all of your required inspections from your development package permit} ; {Activity date: 08/21/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Mike will reschedule once he has his notice of intent, and signage posted, and his controls in place.} ; {Activity date: 08/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No contact information provided. There is no address or SWPPP signage posted. And no controls installed. Desert earth 327-4064 is on site, however the workers are busy running tractors. Recall for preconstruction meeting and provide a contact. Provide NOI and post all required permits and addresses. Larson Baker, developer. Cypress engineering 449 Dash2456. Kevin Hall 499-2456. Epstein construction 990-6866. Notice Plan note Number 14 requires engineer certification of conformance to plans for final approval.} |