Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
3730 W RIVER RD
Apply Date:
07/08/2019
Applicant:
Kevin Hall
Description:
SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels

Permit Reviews

Permit Number - DP19-0166
Permit Status: Issued
Permit Description: SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Start Date Submittal Complete Date Status  
06/13/2019 DEV PKG - OK TO SUBMIT 07/15/2019 COMPLETED Review Details
07/08/2019 DEV PKG - OK TO SUBMIT 07/09/2019 COMPLETED Review Details
07/16/2019 DEV PKG 08/05/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP19-0166
Permite Description: SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
05/21/2020 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 05/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues at this time.
} ; {Activity date: 05/19/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Enter not ready for all inspections. This DP is part of a larger development.} ; {Activity date: 05/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out in parking lot.
} ; {Activity date: 05/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out in parking lot.
} ; {Activity date: 04/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time, however there are no controls or signage in place.}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP19-0166
Permit Description: SITE/GRADING - Marana Mktpl, phase 3. Previous bldg #3 being split into bldg #3 and bldg #5 Michaels
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/11/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 05/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no controls in place.}
05/11/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/08/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Chris with Epstein at 481-4745. Please schedule all of your required inspections from your development package permit
} ; {Activity date: 04/08/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Chris with Epstein at 481-4745. Please schedule all of your required inspections from your development package permit} ; {Activity date: 08/21/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Mike will reschedule once he has his notice of intent, and signage posted, and his controls in place.} ; {Activity date: 08/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No contact information provided. There is no address or SWPPP signage posted. And no controls installed. Desert earth 327-4064 is on site, however the workers are busy running tractors. Recall for preconstruction meeting and provide a contact. Provide NOI and post all required permits and addresses.

Larson Baker, developer. Cypress engineering 449 Dash2456. Kevin Hall 499-2456. Epstein construction 990-6866.

Notice Plan note Number 14 requires engineer certification of conformance to plans for final approval.}

Documents

File Name Document Type  
PEMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION - SIGNED.PDF DOCUMENTS VIEW
COMMENT_RESPONSE.PDF DOCUMENTS VIEW
REVISION_LETTER.PDF DOCUMENTS VIEW
REZONING_CONDITIONS.PDF DOCUMENTS VIEW
TUCSON WATER AVAILABILITY, 07.18.19.PDF DOCUMENTS VIEW
1-9 OF 9.PDF DEVELOPMENT PACKAGE VIEW