Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/11/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 04/08/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Chris with Epstein at 481-4745. Please schedule all of your required inspections from your development package permit
|
| 04/08/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Chris with Epstein at 481-4745. Please schedule all of your required inspections from your development package permit |
| 08/21/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Mike will reschedule once he has his notice of intent, and signage posted, and his controls in place. |
| 08/16/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - No contact information provided. There is no address or SWPPP signage posted. And no controls installed. Desert earth 327-4064 is on site, however the workers are busy running tractors. Recall for preconstruction meeting and provide a contact. Provide NOI and post all required permits and addresses.
Larson Baker, developer. Cypress engineering 449 Dash2456. Kevin Hall 499-2456. Epstein construction 990-6866.
Notice Plan note Number 14 requires engineer certification of conformance to plans for final approval. |