Permit: DP19-0166

Parcel: 101235290


Addresses:

3730 W RIVER RD


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP19-0166

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
04/22/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - trash closures and rebar inspections necessary for this project.
04/14/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Trash enclosure pre-grout. Video inspection with Chris.
04/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by SFLORES2 - Trash enclosure footings by video inspection with Chris.
05/21/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Building number five has been completed.
05/19/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Enter not ready for all inspections. This DP is part of a larger development.
05/20/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - not ready. Complete the drainage swale’s from the rain leader to the curb cut as shown.
05/19/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Contractor is still working on entry, temporary fencing is still in place. Drainage work as shown on dp still has not yet been installed through landscaped area behind building
05/12/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Note 15 on page 3 does specify depressed landscaped area behind Cons
05/12/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Note 15 on page 3 does specify depressed landscaped area behind Michael’s.
05/11/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - not ready. Provide water harvesting as shown on your city approved Grading and landscape and water harvesting plan. Kris with Epstein, please provide pictures of your civil drawings via text and or email. Thank you
05/11/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - not ready. Provide water harvesting as shown on your city approved Grading and landscape and water harvesting plan. Kris with Epstein, please provide pictures of your civil drawings via text and or email. Thank you
04/28/2020 ENGR Grading Final TVALENCIA Continued Entered by RSALDAT1 -
04/28/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Contractor preparing for asphalt. Chris via messenger.
04/22/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Installing curbs. Chris at 481-4745.
04/10/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 -
04/08/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Pictures via message. Curbs have been installed, trashing closure is in progress. No landscaping has been installed at this time. Contractor is preparing for concrete at front entryway.
04/08/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Pictures via message. Curbs have been installed, trashing closure is in progress. No landscaping has been installed at this time. Contractor is preparing for concrete at front entryway.
08/16/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Site grading has just started.
05/21/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Marshals, building number five is complete. Complete all work shown for this entire development package, stabilize undeveloped lots, and terminate SWPPP for final approval of this permit.
05/19/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Enter not ready for all inspections. This DP is part of a larger development.
05/11/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Work is still ongoing. CERTIFICATION OF CONFORMANCE SPECIFIED FOR FINAL APPROVAL
07/12/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No new activity on site at this time. Vacant lots remain. 3730 W River Rd,
06/04/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued FOR 3730 W RIVER RD. All of the buildings for this site have not yet been built. Permit has expired.
05/25/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE FOR 6080 N THORNYDALE RD NO ACTIVITY AT THIS TIME
06/03/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - No activity on the site at this time. Two of the five buildings have been built. The undeveloped portion has been stabilized with gravel.
05/11/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 -
08/16/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Desert earth has started grading site. Jobsite shuts down at 1:30.