Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1760 W IRVINGTON RD
Apply Date:
06/13/2019
Applicant:
Ryan Stucki
Description:
SITE/GRADING/SWPPP - Irvington Nineteen Storage, self-storage facility.1st Revision PENDING, Jan

Permit Reviews

Permit Number - DP19-0147
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Irvington Nineteen Storage, self-storage facility.1st Revision PENDING, Jan
Start Date Submittal Complete Date Status  
01/11/2021 DEV PKG - OK TO SUBMIT 02/01/2021 COMPLETED Review Details
02/01/2021 REVISION - - 1ST 04/29/2021 COMPLETED Review Details
05/14/2019 DEV PKG - OK TO SUBMIT 06/17/2019 COMPLETED Review Details
06/17/2019 DEV PKG 07/24/2019 COMPLETED Review Details
08/26/2019 DEV PKG - RESUBMITTAL 10/03/2019 COMPLETED Review Details
11/04/2019 DEV PKG - RESUBMITTAL 12/10/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0147
Permit Description: SITE/GRADING/SWPPP - Irvington Nineteen Storage, self-storage facility.1st Revision PENDING, Jan
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/12/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/12/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED

} ; {Activity date: 08/25/2020; Status: Prior to Intermediates; Inspector: AHINES; Comment: Entered by AHINES2 - Applicant required to upload revision with private sewer, added fence, and relocated north gate to match building package.}
08/18/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - } ; {Activity date: 05/06/2022; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY AT THIS TIME. THE CONTRACTOR WOULD LIKE ME TO VERIFY WHERE WE ARE WITH THEIR METER REQUEST FOR TUCSON WATER DEPT.}
08/18/2022 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - }
08/18/2022 ENGR Engineering Final Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - }
08/18/2022 SITE - Stormwater Follow-up Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - } ; {Activity date: 02/09/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /EXCAVATING FOR THE WATER HARVEST.} ; {Activity date: 01/25/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AS OF TODAY.} ; {Activity date: 01/03/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - STOPPED BY THE SITE TO TALK WITH THE CREWSA ABOUT STORMWATER COMPLAINTS ON THE SITE. HAVE ASKED THE CONTRACTOR TO MAKE SURE THAT THEY ARE CLEANING THE STREETS IF THERE IS TRACKOUT, AND TO MAINTAIN THERE CONTROLS THROUGHOUT THE SITE.
I ADVISED SOME OF THE CREW MEMBERS TO LET THE SUPERINTENDANT KNOW THAT I WILL BE BY THE SITE TOMORROW FOR ADDITIONAL INSPECTIONS.} ; {Activity date: 10/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /INSTALLING 8” STORM DRAIN PIPE.} ; {Activity date: 10/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ INSTALLING 8” STORM DRAIN .60’ LF.

} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION. ADVISED THE CONTRACTOR TO CONTINUE AND SCHEDULE THIS INSPECTION EVERY 2 WEEKS TILL THE DIRT WORK IS COMPLETE. ALSO ADVISED THEM THAT THERE HAVE BEEN SOME MINOR COMPLAINTS FROM THE GENERAL PUBLIC ABOUT BLOWING DUST THIS PAST WEEK, THEY WILL BE WATERING THEIR STOCKPILE BEFORE LEAVING FOR THE WEEKEND.}
08/18/2022 ENGR Grading Final Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - }
08/18/2022 SITE - Stormwater Final Inspection Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - }
08/18/2022 SITE - Stormwater Setup and Controls Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - }
08/18/2022 COT - ENGR - Signage Final Passed {Activity date: 08/18/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
1-18 OF 18.PDF DEVELOPMENT PACKAGE VIEW
PERMIT DOCUMENTS VIEW
CONTRACTOR LETTER DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CONDITION OF TITLE.PDF DOCUMENTS VIEW
DRAINAGE REPORT IRVINGTON NINETEEN STORAGE.PDF DOCUMENTS VIEW
SOILS STUDY REPORT GEOOTECHNICAL.PDF DOCUMENTS VIEW
SWPPP COMPILED.PDF DOCUMENTS VIEW
PIMACO ADDRESSING REVIEW, 07.16.19.PDF DOCUMENTS VIEW
COMMENT RESPONSES.PDF DOCUMENTS VIEW
INFILTRATION TESTING.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 10.21.19.PDF DOCUMENTS VIEW
LOT_SPLIT_WARRANTY_DEED_1.PDF DOCUMENTS VIEW
LOT_SPLIT_WARRANTY_DEED_2.PDF DOCUMENTS VIEW