Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3003 S COUNTRY CLUB RD
Apply Date:
05/24/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Community Food Bank, site config, parking, access.

Permit Reviews

Permit Number - DP19-0129
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Community Food Bank, site config, parking, access.
Start Date Submittal Complete Date Status  
02/03/2020 REVISION - - 1ST 03/16/2020 COMPLETED Review Details
03/30/2020 REVISION - - 1ST 04/03/2020 COMPLETED Review Details
04/12/2021 DEV PKG - OK TO SUBMIT 04/16/2021 COMPLETED Review Details
04/16/2021 REVISION - - 3RD 06/09/2021 COMPLETED Review Details
05/22/2019 DEV PKG - OK TO SUBMIT 06/24/2019 COMPLETED Review Details
06/25/2019 DEV PKG 07/30/2019 COMPLETED Review Details
09/25/2019 DEV PKG - RESUBMITTAL 10/29/2019 COMPLETED Review Details
12/16/2020 DEV PKG - OK TO SUBMIT 12/31/2020 COMPLETED Review Details
12/26/2019 DEV PKG - OK TO SUBMIT 02/03/2020 COMPLETED Review Details
12/31/2020 REVISION - - 2ND 03/25/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0129
Permit Description: SITE/GRADING/SWPPP - Community Food Bank, site config, parking, access.
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/18/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Garret with MW Morisey at 954-3557. Redoing parking lot and installing accessible path. SWPPP required please post signage, and please schedule for stormwater follow up inspections biweekly. Install stormwater controls as needed. Call for rebar inspection at sidewalk scupper.
This job is the food bank.}
02/26/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW}
02/26/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 02/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW}
02/26/2021 COT - ENGR - Signage Final Passed {Activity date: 02/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW}
03/26/2021 SITE - Stormwater Follow-up Passed {Activity date: 03/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 02/26/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW} ; {Activity date: 08/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. Stormwater protections are in place.}
07/02/2021 ENGR Engineering Final Passed {Activity date: 07/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 02/26/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED, COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS.
ALSO PROVIDE THE NOTED CLOSEOUT DOCUMENTATION. APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE SINCE THE PLANS WERE ORIGINALLY APPROVED. CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THE SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLANS.} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW} ; {Activity date: 01/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUED}
07/09/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/09/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 07/08/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL NEED TO REPLACE TWO PLANTS ON THE WEST SIDE OF BUILDING AND TWO TREE STAKES AT THE SOUTHEAST OF THE PROJECT.} ; {Activity date: 03/26/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VLEON1 - PARTIAL AT THIS TIME THE CONTRACTOR HAS MADE PROGRESS ON THE PREVIOUS NOTES OF ITEMS REMAINING: 1) THEY HAVE PLANS SUBMITTED TO CHANGE THE HANDICAP PARKING SPACES (6) FROM THEIR CURRENT TO A BETTER SPACE SOUTH OF THE MAIN ENTRANCE TO THE SITE. THEY HAVE ADVISED ME THAT THE PLANS ARE APPROVED BY THE REVIEWERS AS WE SPEAK, BUT THEY ARE UNABLE TO PRODUCE A SIGNED COPY OF THE PLANS. 2) THEY HAVE COMPLETED THE MINOR WORK ON THE ROCK RIP RAP PLACEMENT WITHIN THE DRAINAGE LOCATED AT THE NORTHWEST CORNER OF THE SOUTHERN PARKING LOT. 3) THE DRAINAGE WAY ALONG THE SOUTHERN BOUNDARY OF THIS SITE HAS BEEN REPAIRED SO THE WATER WILL FREELY DRAIN FROM THE EAST SIDE OF THE SITE TO THE WEST. 4) THE INSTALLATION OF THE PLANTS, TREES, AND THE PLACEMENT OF THE DECOMPOSED GRANITE HAS BEEN COMPLETED THROUGHOUT THE SITE IN THE MEDIAN ISLANDS. THIS WORK WILL BE FULLY CHECKED ON MY NEXT VISIT TO THIS SITE NEXT WEEK POSSIBLY ON TUES} ; {Activity date: 02/26/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS.} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW} ; {Activity date: 12/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Grading for center parking area. Ramp construction in progress. Garret with MW Morrissey}
07/09/2021 SITE - Stormwater Final Inspection Passed {Activity date: 07/09/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 07/08/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL DAVID ROBERTS CAN AP7 IT.} ; {Activity date: 02/26/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY PROVIDE ALL CLOSE OUT DOCUMENTATION AS DISCUSSED DURING THIS VISIT. THIS WILL BE THE NOTIFICATION OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE SINCE THE PLANS WERE ORIGINALLY APPROVED. CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THE SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLAN} ; {Activity date: 02/24/2021; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - RESCHEDULED FOR TOMORROW}
07/15/2021 ENGR Grading Final Passed {Activity date: 07/15/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
1-30 OF 26.PDF DEVELOPMENT PACKAGE VIEW
REV 3 ONLINE SUBMITTAL PAGE, RECVD 04.08.21 AT 9;54AM.PDF DOCUMENTS VIEW
CHANGES LETTER, REVISION.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 03.27.2020.PDF DOCUMENTS VIEW
LETTER, 2020.01.27.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
TRANSMITTAL SHEET.PDF DOCUMENTS VIEW
SWPPP REPORT.PDF DOCUMENTS VIEW
TITLE REPORT - 3.15.19.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CFB TRAFFIC STATEMENT.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 09.11.19.PDF DOCUMENTS VIEW
DRAINAGE REPORT 09.10.19.PDF DOCUMENTS VIEW