Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/18/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. Garret with MW Morisey at 954-3557. Redoing parking lot and installing accessible path. SWPPP required please post signage, and please schedule for stormwater follow up inspections biweekly. Install stormwater controls as needed. Call for rebar inspection at sidewalk scupper.
This job is the food bank. |