Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
05/25/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CN GRADING RIO DEL SOL APARTMENTS.
10/10/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /TRASH ENCLOSURE FLOOR
12/26/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - It appears that the rough grading has already been done however the ground does not appear to of been stabilized. And there is still a temporary curb ramp installed that needs to be removed.
12/24/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - There was no activity at this time. This is a courtesy inspection for John Van Winkle
01/17/2023 ENGR Grading Final Complete (Recurring) Install the rebar for the floor for trash enclosure it’s raining today can I pour concrete today. Need to remove the water that’s on the floor before pouring
04/18/2023 ENGR Grading Final Partial Pass Building one the grading is passed OK for T C O.
05/25/2023 ENGR Grading Final Complete (Recurring) Grading in the front of the building needs to be completed
07/20/2023 ENGR Grading Final Passed
11/23/2022 ENGR Grading Final Complete (Recurring) Good to grout the trash enclosure