Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0103

Parcel: 14025008A


Addresses:

5761 S PARK AV


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP19-0103

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
04/18/2023 ENGR Engineering Final Partial Pass Handicap parking in front of apartment 1111 is NONCOMPLIANT. Trees need to be staked DG needs to be in place. The roof drainage needs to be turned so the water does not run onto the sidewalk
04/18/2023 ENGR Engineering Final Partial Pass The handicap parking area is noncompliance needs to be repaired landscaping is not complete the water drainage is running into the sidewalk needs to be addressed. This is for building one.
05/25/2023 ENGR Engineering Final Complete (Recurring) Greeting in the front of the building need to be completed landscaping is not completed and the ground cover is not completed
05/25/2023 ENGR Engineering Final Complete (Recurring) The grading is not completed the landscape so I completed
05/31/2023 ENGR Engineering Final Partial Pass OK for TCO on building two and three
07/20/2023 ENGR Engineering Final Partial Pass landscape is not complete. OK for TCO for building four and five, level 1 2,3
07/21/2023 ENGR Engineering Final Complete (Recurring) Complete all work is shown on the site on the approved plans prior to calling this inspection in for a final
09/15/2023 ENGR Engineering Final Passed
09/15/2023 ENGR Engineering Final Passed