Permit: DP19-0103
Permit Details
Apply Date:
04/26/2019
Applicant:
Gregory Moore
Description:
GRADING - Rio Del Sol Apartments.
Permit Reviews
Permit Number - DP19-0103
Permit Status: Complete
Permit Description: GRADING - Rio Del Sol Apartments.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/28/2019 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 05/03/2019 | COMPLETED |
04/10/2019 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 05/10/2019 | COMPLETED |
05/10/2019 | DEV PKG | 06/11/2019 | COMPLETED |
06/17/2019 | DEV PKG - RESUBMITTAL | 06/19/2019 | COMPLETED |
03/13/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 03/28/2023 | APPROVED |
02/01/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/10/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP19-0103
Permite Description: GRADING - Rio Del Sol Apartments.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/05/2021 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 02/05/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, TRACK-OUT ROCK NEEDS TO BE INSTALLED AT ENTRANCES} |
08/03/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 08/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / NO CHANGES AS OF TODAY} ; {Activity date: 03/30/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN HAVES NOT STARTED THE INSTALLATION OF THE STORM DRAIN YET .} ; {Activity date: 11/01/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / GOOD AT IS TIME} |
01/17/2023 | ENGR Grading Final | N/A | Complete (Recurring) | Install the rebar for the floor for trash enclosure it’s raining today can I pour concrete today. Need to remove the water that’s on the floor before pouring |
PDSD Site/Engineering Division - Landscaping | N/A | Requested | ||
07/21/2023 | ENGR Engineering Final | N/A | Complete (Recurring) | Complete all work is shown on the site on the approved plans prior to calling this inspection in for a final |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0103
Permit Description: GRADING - Rio Del Sol Apartments.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/05/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/05/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 01/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE NO ONE ON SITE} | |
05/25/2023 | SITE - Stormwater Final Inspection | Passed | ||
05/25/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
07/20/2023 | ENGR Grading Final | Passed | ||
09/19/2023 | ENGR Engineering Final | Passed | ||
09/19/2023 | COT - ENGR - Signage Final | Passed |