Permit: DP19-0070
Permit Details
Apply Date:
03/21/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Tucson Electric Power Sonoran Substation.
Permit Reviews
Permit Number - DP19-0070
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - Tucson Electric Power Sonoran Substation.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/15/2019 | DEV PKG - OK TO SUBMIT | 03/25/2019 | COMPLETED |
| 03/25/2019 | DEV PKG | 05/01/2019 | COMPLETED |
| 06/21/2019 | DEV PKG - RESUBMITTAL | 07/17/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP19-0070
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - Tucson Electric Power Sonoran Substation.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/19/2019 | The salvage-only permit does not allow site grubbing, grading, or construction of any kind, other than the salvaging of those materials as indicated on the approved Native Plant Preservation Plan. No protected native plants, even if indicated on the approved Native Plant Preservation Plan for removal or destruction, may be destroyed or removed from the site until a grading permit has been issued for the project.On-Site MonitoringOn-site monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation must be provided during project construction at the expense of the developer for all residential development that is over five acres and for all commercial and industrial development that is over one acre. The monitoring must be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in Section 7.7.4.D, Professional Expertise. The monitor must provide periodic progress reports to the developer outlining the status of work accomplished and any problems encountered. A copy of these reports must be submitted to the PDSD for the project file. |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0070
Permit Description: SITE/GRADING/SWPPP - Tucson Electric Power Sonoran Substation.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 06/01/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 06/01/2020 | ENGR Engineering Final | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 06/01/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/20/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - No concerns at this time some temporary controls and some permanent controls are installed at this time.} ; {Activity date: 03/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - No concerns at this time.} ; {Activity date: 02/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 01/09/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME CONTROLS ALL APPEAR TO BE WORKING} ; {Activity date: 11/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No NOI Posted at gate. Waddle has been installed around site. Met with foreman for diversified about calling in for install of controls.} | |
| 06/01/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 06/01/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 01/09/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME} ; {Activity date: 10/08/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with general contractor on site went over controls to Install. Install per approved plans. Provide Anoa’i and stormwater controls information at gate.} | |
| 06/01/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/09/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THE PRE-CON MEETING WAS HELD YESTERDAY WITH RON LE DONNE AND REPRESENTATIVES OF DIVERSIFIED.} ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - no stormwater prevention plan noNOI On site. Talk to Brian about getting those and call back for another preconstruction meeting.} | |
| 06/01/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } | |
| 10/31/2023 | ENGR Grading Final | Passed | City Of Tucson water well pass |