Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/01/2020 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by RSALDAT1 - |
| 10/09/2019 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Not ready for Inspection |
Entered by DMERANZ1 - THE PRE-CON MEETING WAS HELD YESTERDAY WITH RON LE DONNE AND REPRESENTATIVES OF DIVERSIFIED. |
| 10/03/2019 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - no stormwater prevention plan noNOI On site. Talk to Brian about getting those and call back for another preconstruction meeting. |