Permit Details

Status:
Complete
Type:
Development Package
Address:
5650 E RIVER RD
Address NEW:
5650 E RIVER RD
Apply Date:
03/07/2019
Applicant:
Description:
SITE - Arizona Self Storage at Rio Verde Village - 3 above ground stories and one basement level sto

Permit Reviews

Permit Number - DP19-0058
Permit Status: Complete
Permit Description: SITE - Arizona Self Storage at Rio Verde Village - 3 above ground stories and one basement level sto
Start Date Submittal Complete Date Status  
03/06/2019 DEV PKG - OK TO SUBMIT 03/12/2019 COMPLETED Review Details
03/12/2019 DEV PKG 04/19/2019 COMPLETED Review Details
06/04/2019 DEV PKG - RESUBMITTAL 07/09/2019 COMPLETED Review Details
07/30/2019 DEV PKG - RESUBMITTAL 08/27/2019 COMPLETED Review Details
09/04/2019 DEV PKG - RESUBMITTAL 09/06/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP19-0058
Permite Description: SITE - Arizona Self Storage at Rio Verde Village - 3 above ground stories and one basement level sto
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/15/2022 ENGR Engineering Final N/A Complete (Recurring) {Activity date: 04/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. This permit has expired. Accessible signage not per plan specifications. Accessible parking out of compliance

} ; {Activity date: 08/25/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - not ready

} ; {Activity date: 08/25/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready

}
07/19/2022 ENGR Grading Final N/A Complete (Recurring) {Activity date: 07/19/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue} ; {Activity date: 06/23/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. The City approved construction documents for this expired permit with an engineering final inspection only shows the majority of the site work requirements to be completed including landscaped area south of The Project along the north bank of the wash.} ; {Activity date: 04/05/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED, MET WITH THE ENGINEER OF RECORD AND THE CONTRACTOR FOR THE POSSIBILITY OF GETTING A TCO FOR THE 1ST FLOOR. DUE TO THAT NONE OF THE PARKING HAS NOT BEEN CONSTRUCTED AT THIS TIME IT IS DENIED. 1) THEY WILL HAVE TO PROVIDE 2 ADA ACCESSIBLE PARKING SPACES AND AN ACCESSIBLE ROUTE TO THE FIRST FLOOR ENTRANCE. 2) ALSO THEY WILL NEED TO PROVIDE ONE REGULAR PARKING SPACE FROM AN OUTER PARKING AREA INTO THE STRUCTURE. 3) CLEAR ALL AREAS AND PASSAGE WAYS WITHIN THE STRUCTURE THAT CONTAIN CONSTRUCTION TRASH, DEBRIS, EXCESS MATERIAL, OR ANYTHING THAT MAY CREATE A HEALTH AND SAFETY ISSUE FOR PEDESTRIANS. THE CONTRACTOR FEELS THAT SINCE HE IS NOT OPENING ANY OF THE UNITS THAT ARE GOING TO BE UTILIZED BY SOMEONE WHO IS HANDICAPPED, IT IS UNFAIR TO WITH HOLD THE TCO. HE WAS ADVISED THAT EVEN THOUGH THEY MAYNOT BE OPENING THOSE AREAS YET, WE CANNOT EXCLUDE THE HANDICAP REQUIREMENTS AT THIS TIME EITHER.

ALSO NOTED DURING THIS INSPECTION THE FOLLOWING ITEMS STILL NEED TO BE ADDRESSED: COMPLETE ALL NATURAL SLOPES THAT APPEAR TO BE EXCESSIVE WITH THE CURRENT GRADES ON THE SLOPES(LESS THAN 3:1 OR STEEPER)PAVING, LANDSCAPING, DRAINAGE OPENINGS AND CHANNELS, ROOF DRAINAGE OPENINGS BENEATH THE STRUCTURE INTO THE EXISTING CHANNEL. ALL THE ABOVE ITEMS WILL BE CHECKED AND ADDRESSED PRIOR TO CLEARING THE CONCERNED ITEMS LISTED ON THE PERMIT.} ; {Activity date: 05/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. This project is running concurrent with DP19 Dash 0187. Construction in progres}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COT LETTER, SCOTT CLARK TO NOVAK ENVIRON..PDF DOCUMENTS VIEW
RESPONSE_LETTER, 06.04.19.PDF DOCUMENTS VIEW
REVISED_DRAINAGE_REPORT.PDF DOCUMENTS VIEW
RESPONSE LETTER (07-29-19).PDF DOCUMENTS VIEW
RVV.DRCAPPROVAL,DESIGNRVWCOMMITTEE.PDF DOCUMENTS VIEW
RESPONSE_LETTER, 09.04.19.PDF DOCUMENTS VIEW
1-15 OF 15.PDF DEVELOPMENT PACKAGE VIEW