Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
03/04/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Shops E2, Tucson Marketplace, Phase 6.

Permit Reviews

Permit Number - DP19-0054
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Shops E2, Tucson Marketplace, Phase 6.
Start Date Submittal Complete Date Status  
01/30/2019 DEV PKG - OK TO SUBMIT 03/05/2019 COMPLETED Review Details
03/06/2019 DEV PKG 06/19/2019 COMPLETED Review Details
05/22/2019 DEV PKG - RESUBMITTAL 06/20/2019 COMPLETED Review Details
06/28/2019 DEV PKG - RESUBMITTAL 07/01/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0054
Permit Description: SITE/GRADING/SWPPP - Shops E2, Tucson Marketplace, Phase 6.
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/30/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 01/30/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 08/01/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - }
01/30/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/30/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 08/01/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/23/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - MW Morisey needs to schedule a preconstruction meeting.}
01/31/2020 SITE - Stormwater Follow-up Passed {Activity date: 01/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/25/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 11/25/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOK AT THE SITE AND TALKED TO MIKE WILHITE AND DICUSSED WHAT HE ANTICITATES WILL BE NEEDED OVER THE NEXT 6 WEEKS. HE IS EXPECTING TO HAVE THE PAVEMENT AND THE BUILDING OPERATIONAL BEFORE THE FIRST OF THE YEAR.} ; {Activity date: 11/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.
} ; {Activity date: 11/07/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 10/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is minor trackout to be noted
} ; {Activity date: 09/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 08/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time
} ; {Activity date: 08/01/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out on Tucson marketplace that needs to be cleaned up}
03/19/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 03/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 03/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 08/01/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - }
03/19/2020 COT - ENGR - Signage Final Passed {Activity date: 03/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 03/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 03/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by SFLORES2 - }
04/02/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Not ready. Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes.} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes.} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes.} ; {Activity date: 01/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Remove the nursery stake and tie off the stakes.} ; {Activity date: 01/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Remove the nursery stake and tie off the stakes.

} ; {Activity date: 12/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - complete landscaping as shown on drawings.}
04/02/2020 ENGR Grading Final Passed {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 07/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is grading site and hauling in dirt from across the street.}
04/02/2020 SITE - Stormwater Final Inspection Passed {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 04/02/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Not ready. Terminate SWPPP.} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Terminate SWPPP.

} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Terminate SWPPP.}
07/15/2020 ENGR Engineering Final Passed {Activity date: 07/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Not ready. Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes.} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes.} ; {Activity date: 03/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes.}