Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP19-0054

Parcel: 13213087F

Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP19-0054

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/30/2020 ENGR Grading Final BBENEDON Approved Entered by SFLORES2 -
01/30/2020 ENGR Grading Final BBENEDON Approved Entered by SFLORES2 -
12/24/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Site entrance and apron.
11/26/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Mike with Morrissey installing curbs, final grades andtrash enclosure slab
10/23/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is performing final grading
09/13/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Catch basin forms. Courtesy inspection for Mike
08/27/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor working on building pad. Mike with MW Morisey on site.
04/02/2020 ENGR Grading Final BBENEDON Approved Entered by VFLORES1 -
04/02/2020 ENGR Grading Final BBENEDON Approved Entered by VFLORES1 -
04/02/2020 ENGR Grading Final BBENEDON Approved Entered by VFLORES1 -
07/23/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is grading site and hauling in dirt from across the street.
11/25/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Trash enclosure slab.
09/30/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Pre-grout.
09/27/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Second enclosure has not been brought to 6 feet, steel has not been placed
09/13/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Catch basin forms. Courtesy inspection for Mike