Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0054
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by VFLORES1 - |
04/02/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by VFLORES1 - |
04/02/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by VFLORES1 - |
03/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Not ready. Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes. |
03/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes. |
03/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes. |
11/07/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - I informed Mike that the building inspectors look at light pole bases. Contact Bruce for same day inspection. |
09/30/2019 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Pre-grout. |
08/08/2019 | ENGR Engineering Final | DROBERTS | Continued | Entered by DMERANZ1 - LOOKED AT THE TRASH ENCLOSURE FOOTER AND THE INSTALLATION OF THE DRAINAGE PIPES. THE CREW HAS NOT REMOVED THE EXISTING CATC BASIN AS SHOWN ON THE APPROVED PLANS. THIS WORK IS NOT BEING ACCEPTED AT THIS TIME IN THE AREA OF THE EXSTNG CATC BASIN. THE PIPE IS APPROVED FOR BACK PER THE MANUFACTURERS SPECIFICATIONS, THE USE OF ANY OTHER TYPE OF MATERIALS WILL REQUIRE REMOVAL AND REPLACEMENT. I QUESTIONED THE CONTRACTOR ABOUT THE BACKFILL REQUIREMENT OVER THE PIPE AT 11:30, HE DID NOT HAVE ONE. I ASKED THAT HE PROVIDE US THE MANUFACTURE CUT SHEET FOR THIS PRODUCT, HE COULDN’T PROVIDE ONE. I CONTACTED JOHN VANWINKLE IN THE OFFICE AND ASKED IF HE COULD GIVE ME A DETERMINATION OF THE BACKFILL REQUIREMENTS. HE CONTACTED ROBERT SHERRY AND ADVISED ME THAT THEY THOUGHT IT SHOULD BE AT LEAST 6 INCHES OVER THE TOP OF THE PIPE. THE CONTRACTOR STOPPED HIS OPERATION BEFORE THIS INFORMATION CAME BACK AT 11:50 AM, SO I WAS NOT ABLE TO ADVISE HIM OF THE INFORMATION. I CONTACTED MIKE WILHITE AFTER 12:30 OF TH BACKFILL INFORMATION, HE WILL RELAY IT TO HIS SUBCONTRACTOR. |
07/15/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by JSCHNEI2 - Approved |
03/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Not ready. Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes. |
03/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes. |
03/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by SFLORES2 - Due to change, rip rap slope is too steep for hand placed. Provide correction. One tree in planter with metal grate missing stakes. |