Permit Details

Status:
Complete
Type:
Development Package
Address:
260 S CHURCH AV
Apply Date:
02/14/2019
Applicant:
Jason Morse
Description:
SITE/GRADING/SWPPP/ IID - TCC Hotel, construction of new hotel.

Permit Reviews

Permit Number - DP19-0038
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP/ IID - TCC Hotel, construction of new hotel.
Start Date Submittal Complete Date Status  
01/15/2019 DEV PKG - OK TO SUBMIT 02/19/2019 COMPLETED Review Details
02/19/2019 DEV PKG 03/25/2019 COMPLETED Review Details
04/19/2019 DEV PKG - RESUBMITTAL 05/03/2019 COMPLETED Review Details
05/06/2019 DEV PKG - RESUBMITTAL 05/06/2019 COMPLETED Review Details
07/16/2020 DEV PKG - OK TO SUBMIT 07/17/2020 COMPLETED Review Details
07/17/2020 REVISION - - 2ND 08/27/2020 COMPLETED Review Details
08/09/2019 DEV PKG - OK TO SUBMIT 09/11/2019 COMPLETED Review Details
09/11/2019 DEV PKG - REVISION 10/24/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0038
Permit Description: SITE/GRADING/SWPPP/ IID - TCC Hotel, construction of new hotel.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/21/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 12/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/21/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 12/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is dirt track out in the street at both site entrances along the south property line. There is also dirt on the sidewalk. Please re-install/correct stormwater protections in these locations.} ; {Activity date: 07/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is dirt track out in the street at both site entrances along the south property line. There is also dirt on the sidewalk. Please re-install/correct stormwater protections in these locations.} ; {Activity date: 01/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - New controls have been installed on the south side of property during work within the right of way.} ; {Activity date: 12/26/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please correct the storm water controls around the existing catch basin} ; {Activity date: 12/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - no issues or concerns at this time} ; {Activity date: 12/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 12/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Please correct controls at existing catch basin and around south perimeter of site.}
12/21/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. New superintendent on site is Ray With the Ryan company at 602-768-4822. I am formed Ray that the letter stating The trash enclosure is in compliance of city of Tucson standard specifications 60,from the engineer will be required for the trash enclosure built about inspections.
They requested that we schedule stormwater inspections by weekly, And intermediate inspections for site grading.

} ; {Activity date: 12/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Meeting with David site superintendent. Walked the site and reviewed the plans. SWPPP signage and controls are in place. Concrete washout containment provided. Eaglerock is performing swppp inspections. Current plan revisions on site. Call for inspections for stormwater follow up biweekly and inspections of stormwater piping along west end of building when ready. Piping at manhole is in place. Rainier engineering. Swaim architects. Civil drawings are pages one through 16. Alex Hines is project manager.} ; {Activity date: 08/26/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with David Romero, Senior superintendent for Ryan at 365-7250. I asked him to start calling in inspections under his development package permit. He insisted that he has had inspections, And that there is an address posted.
}
12/21/2020 COT - ENGR - Signage Final Passed {Activity date: 12/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/23/2020 SITE - Stormwater Follow-up Passed {Activity date: 12/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 12/21/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME. PROVIDE THIS DEPARTMENT WITH AN APPROVED SET OF DRAWINGS, A COPY OF THE NOTIFICATION OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE ON THE NEXT SCHEDULED INSPECTION AS YOUR CLOSEOUT DOCUMENTATION.} ; {Activity date: 11/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. No issues at this time.} ; {Activity date: 11/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Ray with Ryan companies is monitoring track out} ; {Activity date: 10/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME NO CONCERNS AT THIS TIME, MINOR CLEANUP ON SURFACE STREETS TO ENSURE COMPLIANCE.} ; {Activity date: 10/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Work in right of way. Track out contained within right of way. West entrance has no protection

} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. track out noted.} ; {Activity date: 09/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Track out noted at Southwest site entrance. On-going work in right of way. Lane closures in place.

} ; {Activity date: 09/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is traffic out on Cushing Street coming from the unprotected west side entrance.} ; {Activity date: 08/20/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continued. Check out protection has not been corrected. Minor track out exists} ; {Activity date: 07/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is dirt track out in the street at both site entrances along the south property line. There is also dirt on the sidewalk. Please re-install/correct stormwater protections in these locations.} ; {Activity date: 07/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is dirt track out in the street at both site entrances along the south property line. There is also dirt on the sidewalk. Please re-install/correct stormwater protections in these locations.} ; {Activity date: 07/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Ray with Ryan company. Please reinstall track out protection and waddle along site south perimeter fence.} ; {Activity date: 07/21/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE TO SEE WHAT IS HAPPENING AT THIS IME} ; {Activity date: 06/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. I spoke with Ray at 602-768-4822, from Ryan company and requested that he ensure all of his stormwater controls are in place prior to any rain activity, and to schedule this inspection every couple of weeks or as needed.} ; {Activity date: 06/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. There is notable track out on church at both entrances. David with Ryan company} ; {Activity date: 06/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. There is notable track out on church at both entrances. David with Ryan company} ; {Activity date: 06/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - continued. Please inspect stormwater controls and schedule inspection from Development package permit. David w/ Ryan company} ; {Activity date: 01/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No track out on Cushing or church.} ; {Activity date: 12/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - no issues or concerns at this time} ; {Activity date: 12/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
12/23/2020 ENGR Grading Final Passed {Activity date: 12/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 11/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Pavement and walkways.
} ; {Activity date: 11/17/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. Asphalt paving} ; {Activity date: 10/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED, MORK WORK ON THIS SITE IS VERTICAL FOR THE STRUCTURE. CURBS, AND SIDEWALKS ARE BEING CONSTRUCTED AS NEEDED THROUGHOUT THIS SITE.} ; {Activity date: 10/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Work within right of way in progress. Barricades in place

} ; {Activity date: 08/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractors performing work in the right of way. Lane closure in place.} ; {Activity date: 12/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 8 inch schedule 40 PVC storm drain continuation to manhole. OK to cover after removing rocks and concrete debris in the vicinity of the pipe and shading the pipe by hand with clean fill material.
I walked the inspection and the site with David Romero the superintendent for Ryan.} ; {Activity date: 12/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 8 inch storm water piping} ; {Activity date: 12/20/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 12/18/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 8 inch schedule 40 PVC storm drain from Northwest corner of building with 4 inch branch connection. Installed as shown.} ; {Activity date: 12/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Piping is in place at new stormwater manhole per PAG SD 302.}
01/19/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/21/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING AND REMOVE ALL ACCESS MATERIAL FROM SITE OR FENCE IT OFF FROM PUBLIC ACCESS} ; {Activity date: 11/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Approved. To be inspected with finals} ; {Activity date: 10/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Landscaping in right of way.} ; {Activity date: 10/19/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY AT THIS TIME, THIS WILL BE SCHEDULED FOR A LATER DATE ONCE PLANTING HAS STARTED
}
01/20/2021 ENGR Engineering Final Passed {Activity date: 01/20/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 12/23/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Accessible parking has been checked and is within compliance. Landscape island along north edge of parking area requires A grading correction. Concrete ramp will be reconstructed per engineers direction. Complete landscaping, support trees cover Remaining dirt areas. Remove all stormwater controls and cleanup as required.

} ; {Activity date: 12/21/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS NOT READY AT THIS TIME. I WALKED THE SITE WITH RYAN TO DISCUSS WHAT THEY ARE WANTING AND NEEDING IN THE FUTURE. THEY WILL BE LOOKING FOR A TCO ON THE 6TH OF JANUARY IF POSSIBLE. THIS INSPECTION WILL BE RESCHEDULED FOR 12/24/2020. COMPLETE THIS SITE AS SHOWN ON THE APPROVED PLANS.}
01/20/2021 SITE - Stormwater Final Inspection Passed {Activity date: 01/20/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - 280 - AP} ; {Activity date: 01/20/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - 260 - AP}

Documents

File Name Document Type  
REVISION #2 LETTER, 07.16.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR INTENT LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
SWPPP REPORT.PDF DOCUMENTS VIEW
ADDRESSING REVIEW, 03.18.2019.PDF DOCUMENTS VIEW
TEP APPROVAL LETTER, 03.13.2019.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 03.13.2019.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 04.12.19.PDF DOCUMENTS VIEW
EMAIL REGARDING FIRE COMMENT.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 05.06.19.PDF DOCUMENTS VIEW
REVISION #1 LTR, 09.09.19 DOCUMENTS VIEW
1-16 OF 16.PDF DEVELOPMENT PACKAGE VIEW