Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0038
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/21/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/21/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/21/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/13/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Spoke with the superintendent David with Ryan and ask him to call for a preconstruction meeting and storm water inspection’s |
12/23/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by RSALDAT1 - Approved. |
11/20/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by PAHUMAD1 - Continued. Pavement and walkways. |
11/17/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by PAHUMAD1 - Partially approved. Asphalt paving |
10/19/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - IS CONTINUED, MORK WORK ON THIS SITE IS VERTICAL FOR THE STRUCTURE. CURBS, AND SIDEWALKS ARE BEING CONSTRUCTED AS NEEDED THROUGHOUT THIS SITE. |
10/15/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Work within right of way in progress. Barricades in place |
08/20/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Contractors performing work in the right of way. Lane closure in place. |
12/26/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - 8 inch schedule 40 PVC storm drain continuation to manhole. OK to cover after removing rocks and concrete debris in the vicinity of the pipe and shading the pipe by hand with clean fill material. I walked the inspection and the site with David Romero the superintendent for Ryan. |
12/24/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - 8 inch storm water piping |
12/20/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by SFLORES2 - |
12/18/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - 8 inch schedule 40 PVC storm drain from Northwest corner of building with 4 inch branch connection. Installed as shown. |
12/16/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Piping is in place at new stormwater manhole per PAG SD 302. |