Permit: DP19-0038

Parcel: 11720029A


Addresses:

260 S CHURCH AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP19-0038

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/19/2021 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
01/14/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by VLEON1 - PARTIAL FOR 280 S CHURCH AVE - NOT READY FOR FINAL INSPECTION
01/14/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by VLEON1 - PARTIAL FOR 260 S CHURCH AV - NOT READY FOR FINAL INSPECTION
01/13/2021 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VLEON1 - ARTIAL SCHEDULE RE-INSPECTION FOR TOMORROW.
01/13/2021 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VLEON1 - PARTIAL, SCHEDULED FOR RE-INSPECTION FOR TOMORROW
12/23/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Accessible parking has been checked and is within compliance. Landscape island along north edge of parking area requires A grading correction. Concrete ramp will be reconstructed per engineers direction. Complete landscaping, support trees cover Remaining dirt areas. Remove all stormwater controls and cleanup as required.
12/21/2020 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by RSALDAT1 - S NOT READY AT THIS TIME. I WALKED THE SITE WITH RYAN TO DISCUSS WHAT THEY ARE WANTING AND NEEDING IN THE FUTURE. THEY WILL BE LOOKING FOR A TCO ON THE 6TH OF JANUARY IF POSSIBLE. THIS INSPECTION WILL BE RESCHEDULED FOR 12/24/2020.
11/10/2020 ENGR Engineering Final ESTEVENS Not ready for Inspection Entered by PAHUMAD1 - Not ready. Coordinate with DP19 Dash 0123. Ray with Ryan companies
01/20/2021 ENGR Engineering Final MHERNANDEZ Approved Entered by RSALDAT1 - AP
12/23/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Accessible parking has been checked and is within compliance. Landscape island along north edge of parking area requires A grading correction. Concrete ramp will be reconstructed per engineers direction. Complete landscaping, support trees cover Remaining dirt areas. Remove all stormwater controls and cleanup as required.
12/21/2020 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by RSALDAT1 - IS NOT READY AT THIS TIME. I WALKED THE SITE WITH RYAN TO DISCUSS WHAT THEY ARE WANTING AND NEEDING IN THE FUTURE. THEY WILL BE LOOKING FOR A TCO ON THE 6TH OF JANUARY IF POSSIBLE. THIS INSPECTION WILL BE RESCHEDULED FOR 12/24/2020. COMPLETE THIS SITE AS SHOWN ON THE APPROVED PLANS.