Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0038
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/19/2021 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
01/14/2021 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 280 S CHURCH AVE - NOT READY FOR FINAL INSPECTION |
01/14/2021 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 260 S CHURCH AV - NOT READY FOR FINAL INSPECTION |
01/13/2021 | ENGR Engineering Final | MHERNANDEZ | Partial Approval | Entered by VLEON1 - ARTIAL SCHEDULE RE-INSPECTION FOR TOMORROW. |
01/13/2021 | ENGR Engineering Final | MHERNANDEZ | Partial Approval | Entered by VLEON1 - PARTIAL, SCHEDULED FOR RE-INSPECTION FOR TOMORROW |
12/23/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Accessible parking has been checked and is within compliance. Landscape island along north edge of parking area requires A grading correction. Concrete ramp will be reconstructed per engineers direction. Complete landscaping, support trees cover Remaining dirt areas. Remove all stormwater controls and cleanup as required. |
12/21/2020 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - S NOT READY AT THIS TIME. I WALKED THE SITE WITH RYAN TO DISCUSS WHAT THEY ARE WANTING AND NEEDING IN THE FUTURE. THEY WILL BE LOOKING FOR A TCO ON THE 6TH OF JANUARY IF POSSIBLE. THIS INSPECTION WILL BE RESCHEDULED FOR 12/24/2020. |
11/10/2020 | ENGR Engineering Final | ESTEVENS | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. Coordinate with DP19 Dash 0123. Ray with Ryan companies |
01/20/2021 | ENGR Engineering Final | MHERNANDEZ | Approved | Entered by RSALDAT1 - AP |
12/23/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Accessible parking has been checked and is within compliance. Landscape island along north edge of parking area requires A grading correction. Concrete ramp will be reconstructed per engineers direction. Complete landscaping, support trees cover Remaining dirt areas. Remove all stormwater controls and cleanup as required. |
12/21/2020 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - IS NOT READY AT THIS TIME. I WALKED THE SITE WITH RYAN TO DISCUSS WHAT THEY ARE WANTING AND NEEDING IN THE FUTURE. THEY WILL BE LOOKING FOR A TCO ON THE 6TH OF JANUARY IF POSSIBLE. THIS INSPECTION WILL BE RESCHEDULED FOR 12/24/2020. COMPLETE THIS SITE AS SHOWN ON THE APPROVED PLANS. |