Permit Details

Status:
Complete
Type:
Development Package
Address:
4500 E 22ND ST
Apply Date:
02/06/2019
Applicant:
Description:
SITE - Chapman Volkswagen of Tucson - sidewalks, pavement, overhead structure.1st Revision is PE

Permit Reviews

Permit Number - DP19-0030
Permit Status: Complete
Permit Description: SITE - Chapman Volkswagen of Tucson - sidewalks, pavement, overhead structure.1st Revision is PE
Start Date Submittal Complete Date Status  
01/07/2019 DEV PKG - OK TO SUBMIT 02/07/2019 COMPLETED Review Details
01/07/2020 DEV PKG - OK TO SUBMIT 01/22/2020 COMPLETED Review Details
01/22/2020 DEV PKG - REVISION 02/27/2020 COMPLETED Review Details
02/08/2019 DEV PKG 03/19/2019 COMPLETED Review Details
04/15/2019 DEV PKG - RESUBMITTAL 05/03/2019 COMPLETED Review Details
05/21/2019 DEV PKG - RESUBMITTAL 06/11/2019 COMPLETED Review Details
07/09/2019 DEV PKG - RESUBMITTAL 07/31/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0030
Permit Description: SITE - Chapman Volkswagen of Tucson - sidewalks, pavement, overhead structure.1st Revision is PE
Total Completed Inspections - 6
Date Description Inspector Results Comments
08/28/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 08/28/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
08/24/2020 SITE - Stormwater Follow-up Passed {Activity date: 08/24/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/21/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 07/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 07/16/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 06/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time walk site with GC

} ; {Activity date: 05/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - No concerns at this time.} ; {Activity date: 03/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - Walks site with GC no concerns at this time.} ; {Activity date: 02/19/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC went over minor repairs to controls.} ; {Activity date: 01/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 01/07/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with GC no concerns at this time.} ; {Activity date: 12/17/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time. Walks site with GC.} ; {Activity date: 10/30/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 10/11/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walk site with general contractor. No concerns at this time.} ; {Activity date: 09/18/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Walks site with general contractor went over stormwater controlled that need to be repaired.}
08/24/2020 ENGR Grading Final Passed {Activity date: 08/24/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No grading activity at this time. Provide CO T approved revisions for all changes to approved plans.?

} ; {Activity date: 06/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No grading activity at this time working in building.

} ; {Activity date: 05/27/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No grading activity on site at this time.} ; {Activity date: 05/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Working on entrance off of 22nd St.}
08/24/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/24/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/28/2019; Status: Partial Approval; Inspector: RLEDONN1; Comment: Entered by DROBERT5 - SWPPP PRE-CON ONLY, SITE PRECON STILL NEEDS TO BE CALLED IN}
08/28/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.}
08/28/2020 ENGR Engineering Final Passed {Activity date: 08/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 08/24/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Curb ramp from ADA parking over 2% cross slope. Install long-term bicycle parking per approved plan.Complete all signage on site no customers past this point. Complete all work on harvesting areas.Install truncated domes per approved plan. OK for TCO only.

Not ready. Curb ramp from ADA parking over 2% cross slope. Install long-term bicycle parking per approved plan.Complete all signage on site no customers past this point. Complete all work on harvesting areas.Install truncated domes per approved plan. OK for TCO only.

}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 04.09.19.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
OWNER DRIVEN CHANGES DOCUMENTS VIEW
COMMENT RESPONSE LTR, 07.01.19.PDF DOCUMENTS VIEW
DP REVISION DOCUMENTS VIEW
TDOT LANDSCAPE EMAIL.PDF DOCUMENTS VIEW
REV-1 REVISION LETTER DOCUMENTS VIEW
1-17 OF 17.PDF DEVELOPMENT PACKAGE VIEW