Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP19-0030
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/24/2020 | SITE - Stormwater Follow-up | Rledonne | Approved | Entered by RLEDONN1 - |
08/21/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No concerns at this time. |
07/30/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No concerns at this time. |
07/16/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. No concerns at this time. |
06/25/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No concerns at this time walk site with GC |
05/06/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RSALDAT1 - No concerns at this time. |
03/13/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by SFLORES2 - Walks site with GC no concerns at this time. |
02/19/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - Met with GC went over minor repairs to controls. |
01/30/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
01/07/2020 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with GC no concerns at this time. |
12/17/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. Walks site with GC. |
10/30/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - No concerns at this time. |
10/11/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - Walk site with general contractor. No concerns at this time. |
09/18/2019 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DMERANZ1 - Walks site with general contractor went over stormwater controlled that need to be repaired. |