Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
6432 E SPEEDWAY BL
Apply Date:
11/15/2018
Applicant:
Bobbie Varnum
Description:
SITE/GRADING/SWPPP - Arizona Vascular Specialists.

Permit Reviews

Permit Number - DP18-0280
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Arizona Vascular Specialists.
Start Date Submittal Complete Date Status  
02/04/2019 DEV PKG - RESUBMITTAL 03/12/2019 COMPLETED Review Details
03/25/2019 DEV PKG - RESUBMITTAL 04/22/2019 COMPLETED Review Details
04/16/2020 DEV PKG - OK TO SUBMIT 05/18/2020 COMPLETED Review Details
05/18/2020 REVISION - - 2ND 06/05/2020 COMPLETED Review Details
06/22/2020 REVISION - - 2ND 06/30/2020 COMPLETED Review Details
08/26/2019 REVISION - - 1ST 08/26/2019 COMPLETED Review Details
08/26/2019 DEV PKG - REVISION 09/13/2019 COMPLETED Review Details
10/15/2018 DEV PKG - OK TO SUBMIT 11/16/2018 COMPLETED Review Details
11/19/2018 DEV PKG 12/21/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0280
Permit Description: SITE/GRADING/SWPPP - Arizona Vascular Specialists.
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/02/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/02/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC on site looked over approved plans. Went over NOI and swppp. Plan. And corrections to be made to swppp Controlled. Provide stormwater information at entrance.}
06/19/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
06/19/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
06/19/2020 COT - ENGR - Signage Final Passed {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
07/08/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 06/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Went over with GC about revision for water harvesting to be approved by city of Tucson so I can inspect final results.} ; {Activity date: 06/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Went over with GC about revision for water harvesting to be approved by city of Tucson so I can inspect final results.

} ; {Activity date: 06/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. COMPLETE THE INSTALLATION OF ALL LANDSCAPE MATERIAL, TREES, SHRUBS, AND DECOMPOSED GRANITE PRIOR TO SCHEDULING THIS INSPECTION FOR A FINAL.} ; {Activity date: 06/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on landscaping around building.
} ; {Activity date: 06/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on landscaping around building.}
07/08/2020 SITE - Stormwater Follow-up Passed {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 06/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 06/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME. REMOVE ALL STORMWATER CONTROLS FROM THIS SIT PRIOR TO SCHEDULING THI NEXT INSPECTION.}
07/08/2020 SITE - Stormwater Final Inspection Passed {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 06/19/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PROVIDE ALL CLOSEOUT DOCUMENTATION: APPROVED REVISED DRAWINGS APPROVED BY THE CITY OF TUCSON PLANNING AND DEVELOPMENT SERVICES DEPARTMENT, THE NOTICE OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, AND THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.}
07/30/2020 ENGR Engineering Final Passed {Activity date: 07/30/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - . Approved.} ; {Activity date: 07/29/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all notes from last inspection.} ; {Activity date: 07/29/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all notes from last inspection.

} ; {Activity date: 07/09/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete all overhead work at all entrances and exits for building.(Life safety).Complete work for finals.

} ; {Activity date: 07/08/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all exterior work on building for grading final per Dave Roberts.} ; {Activity date: 07/08/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all exterior work on building for grading final per Dave Roberts.} ; {Activity date: 06/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. 1) COMPLETE ALL SITE WORK AS SHOWN ON THE APPROVED PLAN. 2) REMOVE THE NON-COMPLIANT SIDEWALK AS NOTED ON THIS DATE IN THE HANDICAP PARKING AREA, AND THE AREA AT THE NORTHEAST CORNER OF THIS BUILDING WERE THE SIDEWALK HAS BEEN MODIFIED. 3) REMOVE AND REPLACE THE DAMAGED SIDEWALK AT THE SOUTH WEST CORNER OF THE BUILDING WERE MOVEMENT OF THE SIDEWALK HAS BEEN NOTED. 4) ENSURE THAT ALL OF THE STRIPING IS COMPLETE SO THAT WE CAN VERIFY THAT THERE ARE NO OTHER ISSUES. DURING THIS INSPECTION THE MODIFIED PAVEMENT WAS CHECKED AND IT LOOKED TO BE IN COMPLIANCE IN REGARDS TO THE SLOPES. THE WIDTH OF THE PARKING SPACES AND ACCESS AISLES WILL NEED TO BE CHECED PRIOR TO FINAL APPROVAL.
IF THERE ARE ANY QUESTIONS ABOUT THIS INSPECTION I CAN BE CONTACTED AT (520) 349-7643 OR AT David.Roberts@tucsonaz.gov}
07/30/2021 ENGR Grading Final Passed {Activity date: 07/30/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Note, inspector recommends changing status to final for this expired permit as all inspections were approved at time of construction} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.}

Documents

File Name Document Type  
REV LTR, 06.22.20.PDF DOCUMENTS VIEW
REVISIONLTR, 05.14.2020.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GC LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
DP18-0280_ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
CIVIL_RESPONSE.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
REZONING_COMPLIANCE_LETTER.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
ZONING_EXAMINER_AGENDA - REZONING.PDF DOCUMENTS VIEW
2-15-19 DRB LAR-NOTICE TO CLERK.PDF DOCUMENTS VIEW
COMMENT_RESPONSE LTR, 03.21.2019.PDF DOCUMENTS VIEW
TDOT TRAFFIC - SIDEWALK.PDF DOCUMENTS VIEW
REVISION_LETTER, 08.15.19.PDF DOCUMENTS VIEW
1-13 OF 13.PDF DEVELOPMENT PACKAGE VIEW