Permit: DP18-0280
Permit Details
Status:
Complete
Type:
Development Package
Address:
6432 E SPEEDWAY BL
Address NEW:
6432 E SPEEDWAY BL
Apply Date:
11/15/2018
Applicant:
Bobbie Varnum
Description:
SITE/GRADING/SWPPP - Arizona Vascular Specialists.
Permit Reviews
Permit Number - DP18-0280
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Arizona Vascular Specialists.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2019 | DEV PKG - RESUBMITTAL | 03/12/2019 | COMPLETED |
| 03/25/2019 | DEV PKG - RESUBMITTAL | 04/22/2019 | COMPLETED |
| 04/16/2020 | DEV PKG - OK TO SUBMIT | 05/18/2020 | COMPLETED |
| 05/18/2020 | REVISION - - 2ND | 06/05/2020 | COMPLETED |
| 06/22/2020 | REVISION - - 2ND | 06/30/2020 | COMPLETED |
| 08/26/2019 | REVISION - - 1ST | 08/26/2019 | COMPLETED |
| 08/26/2019 | DEV PKG - REVISION | 09/13/2019 | COMPLETED |
| 10/15/2018 | DEV PKG - OK TO SUBMIT | 11/16/2018 | COMPLETED |
| 11/19/2018 | DEV PKG | 12/21/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0280
Permit Description: SITE/GRADING/SWPPP - Arizona Vascular Specialists.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/02/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC on site looked over approved plans. Went over NOI and swppp. Plan. And corrections to be made to swppp Controlled. Provide stormwater information at entrance.} | |
| 06/19/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} | |
| 06/19/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} | |
| 06/19/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 06/19/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED} | |
| 07/08/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 06/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Went over with GC about revision for water harvesting to be approved by city of Tucson so I can inspect final results.} ; {Activity date: 06/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Went over with GC about revision for water harvesting to be approved by city of Tucson so I can inspect final results. } ; {Activity date: 06/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. COMPLETE THE INSTALLATION OF ALL LANDSCAPE MATERIAL, TREES, SHRUBS, AND DECOMPOSED GRANITE PRIOR TO SCHEDULING THIS INSPECTION FOR A FINAL.} ; {Activity date: 06/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on landscaping around building. } ; {Activity date: 06/12/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on landscaping around building.} |
|
| 07/08/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 06/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 06/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME. REMOVE ALL STORMWATER CONTROLS FROM THIS SIT PRIOR TO SCHEDULING THI NEXT INSPECTION.} | |
| 07/08/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 06/19/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PROVIDE ALL CLOSEOUT DOCUMENTATION: APPROVED REVISED DRAWINGS APPROVED BY THE CITY OF TUCSON PLANNING AND DEVELOPMENT SERVICES DEPARTMENT, THE NOTICE OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, AND THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.} | |
| 07/30/2020 | ENGR Engineering Final | Passed | {Activity date: 07/30/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - . Approved.} ; {Activity date: 07/29/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all notes from last inspection.} ; {Activity date: 07/29/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all notes from last inspection. } ; {Activity date: 07/09/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete all overhead work at all entrances and exits for building.(Life safety).Complete work for finals. } ; {Activity date: 07/08/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all exterior work on building for grading final per Dave Roberts.} ; {Activity date: 07/08/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all exterior work on building for grading final per Dave Roberts.} ; {Activity date: 06/19/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. 1) COMPLETE ALL SITE WORK AS SHOWN ON THE APPROVED PLAN. 2) REMOVE THE NON-COMPLIANT SIDEWALK AS NOTED ON THIS DATE IN THE HANDICAP PARKING AREA, AND THE AREA AT THE NORTHEAST CORNER OF THIS BUILDING WERE THE SIDEWALK HAS BEEN MODIFIED. 3) REMOVE AND REPLACE THE DAMAGED SIDEWALK AT THE SOUTH WEST CORNER OF THE BUILDING WERE MOVEMENT OF THE SIDEWALK HAS BEEN NOTED. 4) ENSURE THAT ALL OF THE STRIPING IS COMPLETE SO THAT WE CAN VERIFY THAT THERE ARE NO OTHER ISSUES. DURING THIS INSPECTION THE MODIFIED PAVEMENT WAS CHECKED AND IT LOOKED TO BE IN COMPLIANCE IN REGARDS TO THE SLOPES. THE WIDTH OF THE PARKING SPACES AND ACCESS AISLES WILL NEED TO BE CHECED PRIOR TO FINAL APPROVAL. IF THERE ARE ANY QUESTIONS ABOUT THIS INSPECTION I CAN BE CONTACTED AT (520) 349-7643 OR AT David.Roberts@tucsonaz.gov} |
|
| 07/30/2021 | ENGR Grading Final | Passed | {Activity date: 07/30/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Note, inspector recommends changing status to final for this expired permit as all inspections were approved at time of construction} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} |