Date Description Inspector Results Comments
07/08/2020 ENGR Engineering Final RLEDONNE Approved Entered by JSCHNEI2 - Approved.
07/08/2020 ENGR Engineering Final RLEDONNE Approved Entered by JSCHNEI2 - Approved.
07/02/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME, OK FOR TCO STOCKING ONLY PENDING ALL OTHER INSPECTIONS BEING APPROVED FOR THIS PERMIT, AND CLARIFICATION OF THE ZONING FINAL REQUIREMENTS. ADDITIONAL PERSONNEL HAVE BEEN NOTED WITHIN THIS STRUCTURE ON THIS DATE DURING MY INSPECTION. I HAVE ADVISED DAVID/CAYLOR CONSTRUCTION THAT THEY NEEDED TO LEAVE THIS SITE. NO ONE IS ALLOWED ON THIS SITE EXCEPT CAYLOR PERSONNEL AND THEIR SUBCONTRACTORS.
07/02/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME, OK FOR TCO STOCKING ONLY PENDING ALL OTHER INSPECTIONS BEING APPROVED FOR THIS PERMIT, AND CLARIFICATION OF THE ZONING FINAL REQUIREMENTS. ADDITIONAL PERSONNEL HAVE BEEN NOTED WITHIN THIS STRUCTURE ON THIS DATE DURING MY INSPECTION. I HAVE ADVISED DAVID/CAYLOR CONSTRUCTION THAT THEY NEEDED TO LEAVE THIS SITE. NO ONE IS ALLOWED ON THIS SITE EXCEPT CAYLOR PERSONNEL AND THEIR SUBCONTRACTORS.
07/01/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready walk site with Dave Roberts and GC went over work that needs to be completed for finals.
07/01/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready walk site with Dave Roberts and GC went over work that needs to be completed for finals.
06/26/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by RSALDAT1 - Partial approval. Walk site with GC went over work that needs to be completed before final. Providing physical separation at ADA parking middle two stalls on East side of building. Provide revision for water harvesting. Bicycle parking on East side of building short term. Complete all work per approve plan.
06/26/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by RSALDAT1 - Partial approval. Walk site with GC went over work that needs to be completed before final. Providing physical separation at ADA parking middle two stalls on East side of building. Provide revision for water harvesting. Bicycle parking on East side of building short term. Complete all work per approve plan.
07/30/2020 ENGR Engineering Final RLEDONNE Approved Entered by RSALDAT1 - . Approved.
07/29/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Complete all notes from last inspection.
07/29/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Complete all notes from last inspection.
07/09/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by RSALDAT1 - Not ready. Complete all overhead work at all entrances and exits for building.(Life safety).Complete work for finals.
07/08/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Complete all exterior work on building for grading final per Dave Roberts.
07/08/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. Complete all exterior work on building for grading final per Dave Roberts.
06/19/2020 ENGR Engineering Final DROBERTS Continued Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. 1) COMPLETE ALL SITE WORK AS SHOWN ON THE APPROVED PLAN. 2) REMOVE THE NON-COMPLIANT SIDEWALK AS NOTED ON THIS DATE IN THE HANDICAP PARKING AREA, AND THE AREA AT THE NORTHEAST CORNER OF THIS BUILDING WERE THE SIDEWALK HAS BEEN MODIFIED. 3) REMOVE AND REPLACE THE DAMAGED SIDEWALK AT THE SOUTH WEST CORNER OF THE BUILDING WERE MOVEMENT OF THE SIDEWALK HAS BEEN NOTED. 4) ENSURE THAT ALL OF THE STRIPING IS COMPLETE SO THAT WE CAN VERIFY THAT THERE ARE NO OTHER ISSUES. DURING THIS INSPECTION THE MODIFIED PAVEMENT WAS CHECKED AND IT LOOKED TO BE IN COMPLIANCE IN REGARDS TO THE SLOPES. THE WIDTH OF THE PARKING SPACES AND ACCESS AISLES WILL NEED TO BE CHECED PRIOR TO FINAL APPROVAL. IF THERE ARE ANY QUESTIONS ABOUT THIS INSPECTION I CAN BE CONTACTED AT (520) 349-7643 OR AT David.Roberts@tucsonaz.gov