Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/03/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by SFLORES2 - |
| 03/03/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by SFLORES2 - |
| 02/19/2020 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete work before calling for inspection. |
| 02/18/2020 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Work not complete and trashing closure. |
| 02/11/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by DMERANZ1 - Rebar for walls in trashing closure OK for grouting. |
| 02/10/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by DMERANZ1 - Provide vertical rebar in trashing closure Past bond beam provide clean out. |
| 02/05/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by DMERANZ1 - Footer for trash enclosure rebar OK. |
| 06/19/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by RSALDAT1 - IS APPROVED
|
| 06/12/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Met on site with GC grading contractor and asphalt contractor about vertical curbs not per approve plans. At 6 inch reveal. Talked with Steve Shields he said he would except a minimum of close to 5 inches.Per email. |
| 06/12/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Met on site with GC grading contractor and asphalt contractor about vertical curbs not per approve plans. Talked about options waiting for Response from Steve shields. Or John Van Winkle.
|
| 06/02/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Walk site with GC vertical curbs in some parking areas under 6 inches. Provide revisions for all changes to grading and drainage. Minimum 6 inch reveal on curbs in parking area per plan. |
| 06/02/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Walk site with GC vertical curbs in some parking areas under 6 inches. Provide revisions for all changes to grading and drainage. Minimum 6 inch reveal on curbs in parking area per plan. |
| 05/27/2020 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No grading activity at this time working on building. |
| 07/08/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 07/08/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 07/30/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - Continued. Note, inspector recommends changing status to final for this expired permit as all inspections were approved at time of construction |
| 07/08/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 07/08/2020 |
ENGR Grading Final |
RLEDONNE |
Approved |